Staging of works

For up-to-date traffic arrangements refer to the daily traffic update page.

The entire northern stage of works north of Fairbairn Avenue to the Federal Highway is now complete and is open to road users.

Looking southward from the Federal Highway interchange to the Majura Parkway

The south stage of works will connect Majura Parkway to the Monaro Highway, and is expected to have some impacts on roads that provide access to the Canberra Airport and Majura Park business precinct.

Works associated with the southern stage is currently underway. These works involve significant earthworks construction and major structures including the Molonglo River bridge. These works are expected to be completed by mid 2016.Where possible, the road construction plan ensures minimal disruptions  to road users and limits work on the existing road network. For example, the Molonglo River Bridge construction will take place above the road and the bridge piers will be strategically placed to prevent disruption to existing traffic flows.

The ACT Government will work with the contractor and stakeholders to minimise traffic disruptions along Morshead Drive between Pialligo Avenue and Fairbairn Avenue, and at the Dairy Road roundabout.

Night works

The ACT Government has approved some night work to minimise construction impacts on road users. These works will be developed in consultation with stakeholders and the construction contractor to ensure there are no adverse impacts. For example, activities such as transporting road materials may be carried  out overnight.

Night work conducted on Fairbain Avenue

Safety requirements for contractors

As part of the tender process, contractors were evaluated on their safety measures and were required to be accredited by the Australian Government Building and Construction OHS Accreditation Scheme. This scheme ensures contractors have robust safety management systems in place.A new roundabout was constructed on Tambreet Street on the old Majura Road to improve traffic flow and safety.

A new roundabout was constructed at the Tambreet Street interchange

Traffic updates during works

Road users are encouraged to monitor traffic updates and avoid major areas of work at peak hours. The ACT Government will provide regular construction updates and communicate potential impacts on road users. Where possible, alternate routes will be identified and sign posted as part of the traffic management  arrangements.

For up to date traffic arrangements refer to the Daily Traffic Updates Page.A new bridge on the Majura Parkway built in a 'Super T' construction method.

The ACT Government is committed to improving the accessibility of web content. To provide feedback or request an accessible version of a document please contact us or phone 13 22 81.

We acknowledge the Traditional Custodians of the ACT, the Ngunnawal people. We acknowledge and respect their continuing culture and the contribution they make to the life of this city and this region.

Bookmark and Share

Feedback | Languages | Sitemap | Jobs ACT | Privacy | Disclaimer | Copyright Page last updated on 24 April 2018