Community Paths

Date / TimeSuburbLocation / Reason
7 am Monday 3 July 2017 to 5 pm Wednesday 28 February 2018.Acton - Parkes

SHARED USE PATH: Barrine Drive both sides from approximately 75 metres on the eastern side of Commonwealth Avenue to Corkhill Street.

Connection from the Commonwealth Avenue (northbound) northern bridge abutment to Barrine Drive.

FOOTPATH: Albert Street (southern side from Commonwealth Avenue to Barrine Drive.



Works associated with the West Basin redevelopment. Point Park - Phase 1.

Notification date: 05 Jul 2017
7 am Thursday 23 November 2017 to 5 pm Sunday 30 December 2018.AmarooFOOTPATH: Horse Park Drive (western side) located on either side of Katherine Avenue (South).

Works associated with the Horse Park Drive duplication project.

Notification date: 15 Nov 2017
7 am Friday 15 September 2017 to 5 pm Wednesday 30 May 2018.Amaroo

FOOTPATH / VERGE: Horse Park Drive Service road (southern side) from Emerald Way to Crossman Street

Pioneer Street (northern side) from Emerald Way to Crossman Street.



Building construction works associated with the development of Block 1, Section 110 Amaroo

Notification date: 14 Sep 2017
6 am Thursday 23 March 2017 to 7 pm Thursday 20 December 2018.AmarooPUBLIC OPEN SPACE / FOOTPATHS: Located within Blocks 3, 4 & 5, Section 114 Amaroo.

Building construction works associated with the development of Blocks 1 & 2, Section 114 Amaroo.

Notification date: 15 Mar 2017
7 am Monday 13 February 2017 to 6 pm Wednesday 1 August 2018Amaroo

FOOTPATH / VERGE: Emerald Way (eastern side) from Horse Park Drive to Pioneer Street.

Crossman Street (western side) from Horse Park Drive to Pioneer Street.



Building construction works associated with the development of Block

Notification date: 13 Feb 2017
Will remain closed until 7 pm Thursday 20 December 2018.Amaroo

FOOTPATH / NATURE STRIP: Pioneer Street (southern side) from the pedestrian crossing located on the western side of Emerald Way to Balgarup Street.

Balgarup Street (eastern side) from Pioneer Street (northern side) to Aberfoyle Street.

Aberfoyle Street (northern side) from Balgarup Street to the public open space located on Block 5, Section 114.



Building construction works associated with the development of Blocks 1 & 2, Section 114 Amaroo.

Notification date: 15 Mar 2017
7 am Tuesday 23 May 2017 to 6 pm Monday 15 July 2019.BelconnenFOOTPATH / VERGE: Emu Bank (southern side) from Benjamin Way to Beissel Street.

Building construction works associated with the redevelopment of Block 37, Section 52 Belconnen.

Notification date: 16 May 2017
9 am Monday 19 February 2018 to 4 pm Monday 23 April 2018.BelconnenFOOTPATH: Chandler Street (western side) from the pedestrian crossing located on the northern side of Cohen Street to the southern side of Cohen Street. This closure also includes the stairs from Chandler Street down to Cohen Street located on the southern side of Cohen Street.

Chandler Street bridge abutment works.

Notification date: 13 Feb 2018
7 am Saturday 1 July 2017 to 6 pm Wednesday 1 July 2020.Belconnen.

FOOTPATH: Cameron Avenue (northern side) from Chandler Street to Edmondstone Place.

Chandler Street (eastern side) from Cameron Avenue to approximately 55 metres north of Cameron Avenue.



Building construction works associated with the redevelopment of Blocks 8 & 9, Section 48 Belconnen.

Notification date: 21 Jun 2017
6 am Monday 26 February 2018 to 8 pm Thursday 31 May 2018.BRADDONFOOTPATH: Mort Street (western side) from Elouera Street to approximately 40 metres south of Elouera Street towards Cooyong Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 19 Feb 2018
10 pm Friday 2 March 2018 to 4 am Monday 5 March 2018.BRADDON SIGNALISED PEDESTRIAN CROSSING: Northbourne Avenue (southern side) at the intersection of Ipima Street and Condamine Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 20 Feb 2018
6 am Monday 26 February 2018 to 6 pm Thursday 26 April 2018.BRADDONFOOTPATH: Elouera Street (southern side) from Torrens Street to approximately 25 metres west towards Lonsdale Street.

ICON Water service connection associated with the redevelopment of Block 1, section 29 Braddon

Notification date: 19 Feb 2018
7 am Friday 8 September 2017 to 6 pm Friday 23 February 2018BraddonFOOTPATH: Mort Street (eastern side) adjacent to 32 Mort Street.

Excavation works associated with the redevelopment of Block 3, Section 28 Braddon.

Notification date: 07 Sep 2017
6 am Friday 1 December 2017 to 6 pm Friday 19 April 2019.BraddonFOOTPATH: Mort Street (western side) from Elouera Street to approximately 100 metres north of Elouera Street towards Girrahween Street.

Building construction works associated with the redevelopment of Blocks 7, 8 & 9, Section 19 Braddon (former NRMA building).

Notification date: 16 Nov 2017
7 am Thursday 20 July 2017 to 6 pm Tuesday 10 July 2018.Braddon

FOOTPATH / VERGE:

From Cooyong Street to Currong Street (North).

Currong Street (North) western side from Ainslie Avenue to the unnamed road located approximately 115 metres south of Donaldson Street.



Building construction works associated with the redevelopment of Block 2, Section 52 Braddon (former Currong Flats site).

Notification date: 13 Jul 2017
9.30 am Monday 12 February 2018 to 8 pm Monday 26 February 2018.BRADDON - TURNERSIGNALISED PEDESTRIAN CROSSINGS: Northbourne Avenue (northern and southern side) at the intersection of Ipima Street and Condamine Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 08 Feb 2018
6 am Saturday 22 July 2017 to 6 pm Saturday 1 December 2018.Campbell

FOOTPATH / VERGE:

Creswell Street (western side) from Constitution Avenue to Pentland Street.

Pentland Street (southern side) from Creswell Street to Kalma Way.

Kalma Way (both sides) from Constitution Avenue to Pentland Street.



Building construction works associated with the development of Block 1, Section 133 Campbell.

Notification date: 13 Jul 2017
7 am Thursday 26 January 2017 to 1 pm Saturday 1 September 2018.CampbellFOOTPATH / NATURE STRIP: Pentland Street (southern side) from Provan Street to Kalma Way.

Building construction works associated with the development of block 1, Section 132 Campbell.

Notification date: 25 Jan 2017
7 am Monday 5 February 2018 to 5 pm Friday 2 March 2018.ChifleyFOOTPATH / NATURE STRIP: Eggleston Crescent (southern side) outside number 110.

Installation of underground services associated with the redevelopment of Block 38, Section 33 Chifley.

Notification date: 30 Jan 2018
Will remain closed until 6 pm Thursday 29 March 2018City Knowles Place footpath (eastern side) will be closed from the kerb ramp located at the rear of the City Police station to approximately 125 metres in a northerly direction towards the ACT Magistrates Court building.

(Pedestrian access to the Law Courts will be maintained during these works).



Underground service relocation works associated with the ACT Law Courts project.

Notification date: 22 Dec 2016
6 am Monday 15 May 2017 to 6 pm Wednesday 15 May 2019.City

FOOTPATH / VERGE & OFF STREET PARKING AREA: Located on the northern side of Veterans Park between Northbourne Avenue and Mort Street.

Mort Street (northern side) from Cooyong Street to the footpath on the northern side of Veterans Park.



Demolition of existing building and construction works associated with the redevelopment of Section 26 City.

Notification date: 11 May 2017
5 pm Friday 17 June 2016 to 7 pm Thursday 20 December 2018.City

FOOTPATH / NATURE STRIP: Vernon Circle / Northbourne Avenue (northern and western side) from approximately 45 metres on the southern side of the ACT Magistrates Court to the ACT Law Courts precinct footpath connection located approximately 75 metres south of London Circuit.



Construction works associated with the ACT Law Courts project.

Notification date: 15 Apr 2016
7 am Tuesday 27 September 2016 to 6 pm Thursday 27 September 2018.City

FOOTPATH: Rabaul Lane (eastern side) from Akuna Street to approximately 100 metres southwest towards Nangari Street.

PUBLIC OPEN SPACE: A section of public open space located on the podium level above Rabaul Lane adjacent to Block 3, Section 12 City will be closed.



Building construction works associated with the redevelopment of Block 3, Section 12 City.

Notification date: 16 Sep 2016
6 am Tuesday 1 August 2017 to 8 pm Wednesday 28 February 2018.CityFOOTPATH: Cooyong Street (southern side) from Northbourne Avenue to Mort Street.

Building demolition works associated with the redevelopment of Section 26 City.

Notification date: 25 Jul 2017
Will remain closed from 6 pm Friday 1 December 2017 to 6 pm Sunday 30 September 2018.City FOOTPATHS: On the western side of the Hillside Lane western entrance will be closed.

Eclipse House building refurbishment works

Notification date: 30 Nov 2017
Will be closed for approximately a ten week period between 6 am Thursday 16 November 2017 and 8 pm Monday 19 March 2018.CityPUBLIC OPEN SPACE BLOCK 31, SECTION 3 CITY: Located between Hobart Place and the Ben Aulich & Associates building.

Underground service relocation works associated with the redevelopment of Blocks 3,4 &13, Section 3 City

Notification date: 16 Nov 2017
Closure dates and times are listed with the closure locations.CityFOOTPATH: Northbourne Avenue (eastern side) from Cooyong Street to the footpath on the northern side of Veterans Park. TIME: 6 am – 4 pm (daily) on periodic days as required Monday to Saturday from Wednesday 28 February 2018 to 4 pm Saturday 30 November 2019. FOOTPATH / VERGE & OFF STREET PARKING AREA: Located on the northern side of Veterans Park between Northbourne Avenue and Mort Street. Mort Street (northern side) from Cooyong Street to the footpath on the northern side of Veterans Park. TIME: 6 am Wednesday 28 February 2018 to 4 pm Saturday 30 November 2019.

Construction works associated with the redevelopment of Section 26 City.

Notification date: 15 Feb 2018
7 am Monday 6 February 2017 to 6 pm Thursday 6 June 2018.CoombsFOOTPATH/ NATURE STRIP: Woodberry Avenue western side from Terry Connolly Street to Harold White Avenue.

Building construction associated with the development of block 2 section 12, Coombs.

Notification date: 31 Jan 2017
7 am Wednesday 19 April 2017 to 5 pm Friday 29 June 2018Coombs

FOOTPATH / NATURE STRIP: Woodberry Avenue (western side) from the pedestrian refuge crossing located approximately 80 metres north of Terry Connolly Street to Newchurch Street.



Building construction works associated with the development of Block 1, Section 18 Coombs.

Notification date: 30 Mar 2017
7 am Monday 13 November 2017 to 6 pm Tuesday 13 November 2018.CoombsFOOTPATH / VERGE: Arthur Blakeley Way (northern side) from Colbung Street to Fairhall Street.

Building construction works associated with the development of Block 3, Section 41 Coombs.

Notification date: 07 Nov 2017
7 am Monday 13 November 2017 to 6 pm Tuesday 13 November 2018.CoombsFOOTPATH / VERGE: Pearlman Street (western side) from Cotter road to the pedestrian refuge crossing located approximately 75 metres south of Woodberry Avenue.

Building construction works associated with the development of Block 3, Section 2 Coombs.

Notification date: 07 Nov 2017
7.30 am Wednesday 25 October 2017 to 5.30 pm Friday 13 April 2018.Denman ProspectFOOTPATH: Wyndham Avenue (northern side) from the raised pedestrian crossing located approximately 235 metres west of Bielski Street to John Gorton Drive.

Construction of a new road.

Notification date: 25 Oct 2017
7 am Tuesday 1 September 2015 to 5 pm Friday 1 June 2018.DicksonCape Street between Woolley Street and Badham Street (south side only). Footpath between Badham Street and the community path north of Daramalan College

Building construction works associated with development of Block 31, Section 34 Dickson

Notification date: 25 Aug 2015

10 pm Friday 23 February 2018 to 4 am Monday 26 February 2018.

10 pm Friday 2 March 2018 to 4 am Monday 5 March 2018.

Downer - Dickson - Lyneham

SIGNALISED PEDESTRIAN CROSSING: Northbourne Avenue (northern and southern side) at the intersection of Antill Street / Mouat Street.

Please note one signalised pedestrian crossing will remain open at all times during these works.



Civil works associated with the Transport Canberra Light Rail project.

Notification date: 13 Feb 2018
7 am Thursday 7 September 2017 to 5 pm Friday 30 March 2018.FarrerFOOTPATH: Footpath connection between the northern and southern side of Beasley Street immediately adjacent to the eastern side of Wilkins Street.

Civil works associated with the construction of the Goodwin aged care facility.

Notification date: 06 Sep 2017
7 am Monday 11 September 2017 to 5 pm Saturday 28 February 2018.Forde - GungahlinPEDESTRIAN UNDERPASS / FOOTPATH: Horse Park Drive from approximately 50 metres west of Horse Park Drive adjacent to Strayleaf Crescent to approximately 70 metres east of Horse Park Drive on the southern side of Neil Harris Crescent.

Works associated with the Horse Park Drive duplication.

Notification date: 05 Sep 2017
7 am – 6 pm (daily) on periodic days as required Monday to Sunday from Monday 8 January 2018 to Sunday 30 September 2018.ForrestNATURE STRIP: National Circuit (northern side) in front of number 47-49

Building construction works associated with the redevelopment of Blocks 19 & 20, Section 20 Forrest

Notification date: 20 Dec 2017
6 am Monday 7 August 2017 to 8 pm Tuesday 1 January 2019.Fyshwick

FOOTPATH / NATURE STRIP: Beaconsfield Street / Tom Price Street (southern and western side) from approximately 125 metres southeast of Lenora Street to the Iron Knob Street / Tom Price Street roundabout.

Iron Knob Street (northern side) from approximately 10 metres west of Geraldton Crescent (east) to Tom Price Street.



Building construction works associated with the development of Blocks 3 & 4, Section 85 Fyshwick.

Notification date: 02 Aug 2017
7 am Friday 3 November 2017 to 5 pm Wednesday 28 February 2018.GarranFOOTPATH: Hospital Road (western side) between the main entrance of Canberra Hospital and ACT Pathology building

Footpath reconstruction

Notification date: 01 Nov 2017
6 am Wednesday 24 January 2018 to 6 pm Sunday 1 July 2018.Gowrie - Monash - Richardson

FOOTPATH: Erindale Drive (southern side) located on either side of Ashley Drive.

Ashley Drive (eastern side) from the bus stop located on Clift Crescent between Hemmings Crescent and Ashley Drive to the footpath on the southern side of the stormwater drain located approximately 55 metres south of Isabella Drive.



Works associated with the Ashley Drive duplication – Stage 2.

Notification date: 24 Jan 2018
7 am Monday 19 February 2018 to 6 pm Saturday 3 March 2018.GreenwayFOOTPATH: Limburg Way (northern side) from Anketell Street to the driveway of 8 Limburg Way. Anketell Street (western side) from Limburg Way to approximately 20 metres north of Limburg Way towards Reed Street.

Bunnings Tuggeranong external works.

Notification date: 17 Feb 2018

7 am Monday 4 September 2017 to 6 pm Thursday 4 January 2018.

7 am – 6 pm (daily) Monday to Saturday on periodic days as required from Thursday 4 January 2018 to Tuesday 4 September 2018.

GreenwayFOOTPATH / VERGE: Cynthea Teague Crescent (northern and eastern side) from Oakden Street to Anketell Street.

Building construction works associated with the development of Block 1, Section 79 Greenway.

Notification date: 30 Aug 2017
6.30 am Monday 22 May 2017 to 7 pm Monday 6 August 2018.GreenwayFOOTPATH / VERGE: Cynthia Teague Crescent (northern side) adjacent to Block 1, Section 75 Greenway

Building construction works associated with the development of Block 1, Section 75 Greenway.

Notification date: 19 May 2017
9 am Tuesday 6 February 2018 to 4 pm Friday 23 February 2018.GreenwayFOOTPATH: Limburg Way (northern side) from Anketell Street to the driveway of 8 Limburg Way.

Bunnings Tuggeranong external works.

Notification date: 06 Feb 2018
6 am Monday 18 September 2017 to 8 pm Sunday 1 April 2018.GreenwayFOOTPATH / VERGE: Oakden Street (eastern side) from Cynthea Teague Crescent to Anketell Street. Cynthea Teague Crescent (southern and western side) from Oakden Street to Anketell Street.

Building construction works associated with the development of Block 1, Section 78 Greenway.

Notification date: 11 Sep 2017
9.30 am Tuesday 6 February 2018 to 3.30 pm Tuesday 31 July 2018.Greenway - MonashSHARED USE PATH: Located on the northern side of the Drakeford Drive / Athllon Drive roundabout. From the northern side of Athllon Drive to the eastern side of Drakeford Drive.

Construction of a new watermain associated with the Isabella Weir upgrade and wetlands project

Notification date: 06 Feb 2018
7 am – 5 pm (daily) Monday to Saturday on periodic days as required from Monday 15 January 2018 to Saturday 2 March 2019.GungahlinFOOTPATH / VERGE: Gungahlin Place (eastern side from Sarre Street to Anthony Rolfe Avenue.

Building construction works associated with the development of Block 1, Section 68 Gungahlin.

Notification date: 14 Dec 2017
7 am Friday 17 November 2017 to 5 pm Saturday 31 March 2018.Gungahlin

FOOTPATH: Gozzard Street (eastern side) on either side of Ernest Cavanagh Street.

Ernest Cavanagh Street (northern and southern side) on either side of Gozzard Street.



Footpath works associated with the Gungahlin Bus Station project.

Notification date: 16 Nov 2017
7 am Tuesday 23 January 2018 to 5 pm Saturday 24 February 2018.GungahlinFOOTPATH: Gozzard Street (eastern side) from Delma View to approximately 20 metres north towards The Valley Avenue.

Works associated with the Gungahlin Town Centre estate works.

Notification date: 24 Jan 2018
6 am Monday 7 November 2016 to 6 pm Friday 29 June 2018.GungahlinFOOTPATH / NATURE STRIP: Hinder Street (western side) from Ernest Cavanagh Street to Anthony Rolfe Avenue.

Building construction works associated with the development of Block 7, Section 38 Gungahlin.

Notification date: 31 Oct 2016
7 am Wednesday 17 January 2018 to 5 pm Friday 2 March 2018.Gungahlin SHARED USE PATH: Anthony Rolfe Avenue (southern side) from Gozzard Street to Gribble Street.

Construction of an electricity feeder to the Gungahlin town centre.

Notification date: 11 Jan 2018
7 am Monday 15 January 2018 to 5 pm Saturday 2 March 2019.GungahlinFOOTPATH: Donnelly Lane (western side) from Sarre Street to Huyer Street.

Building construction works associated with the development of Block 1, Section 68 Gungahlin.

Notification date: 14 Dec 2017
7 am Monday 4 December 2017 to 5 pm Wednesday 28 February 2018.Gungahlin

FOOTPATH / VERGE: The Valley Avenue (northern side)) from the footpath crossing located between Gungahlin Place (East and West) and the Winyu House driveway.

Gungahlin Place (East) eastern side) from The Valley Avenue to approximately 40 metres north towards Efkarpidis Street.

Stage 1

The Valley Avenue (northern side)) from the footpath crossing located between Gungahlin Place (East and West) to approximately 35 metres west of Gungahlin Place (West) towards Gozzard Street.

Gungahlin Place (West) (western side) from The Valley Avenue to approximately 40 metres north towards Efkarpidis Street.

Stage 2

Only one stage of works will be undertaken at any given time.



Civil works associated with the Gungahlin Town Centre Estate Works project.

Notification date: 24 Nov 2017
9.30 am Monday 19 February 2018 to 6 pm Saturday 30 June 2018.GUNGAHLINSHARED USE PATH: Flemington Road (northern side) from Manning Clark Crescent (North) to Kate Crace Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 19 Feb 2018
7 am Monday 15 January 2018 to 5 pm Wednesday 28 February 2018.Gungahlin

FOOTPATH: Ernest Cavangh Street (southern side) on either side of Gungahlin Place.

Hibberson Street (northern and southern side) on either side of Gungahlin Place.

Efkarpidis Street (northern side) on either side of Gungahlin Place.



Works associated with the Gungahlin bus station project.

Notification date: 09 Jan 2018
7 am Monday 28 August 2017 to 6 pm Friday 20 December 2019.GungahlinFOOTPATH / VERGE: Gribble Street (western side) between the Bright Beginnings Gungahlin driveway and Anthony Rolfe Avenue.

Building construction works associated with the development of Block 5, Section 209 Gungahlin.

Notification date: 25 Aug 2017
6 am -11 am (daily) on periodic days as required Monday to Friday from Tuesday 19 September 2017 to Friday 28 June 2019.GungahlinFOOTPATH: Hibberson Street (northern side) from Gozzard Street to Gribble Street.

Construction works associated with the Raiders Club refurbishment project.

Notification date: 19 Sep 2017
7 am -11 am (daily) on periodic days as required Monday to Friday from Thursday 14 September 2017 to Friday 28 June 2019.GungahlinFOOTPATH: Hibberson Street (northern side) from Gozzard Street to Gribble Street.

Construction works associated with the Raiders Club refurbishment project.

Notification date: 14 Sep 2017
6 am Thursday 6 April 2017 to 7 pm Saturday 30 March 2019.GungahlinVERGE: Swain Street (northern side) from the driveway at 94 Swain Street to approximately 30 metres west towards Gribble Street.

Sales display suite.

Notification date: 31 Mar 2017
7 am Saturday 20 May 2017 to 6 pm Tuesday 1 May 2018.Gungahlin

FOOTPATH/ VERGE: Hinder Street (eastern side) from The Valley Avenue to Efkarpidis Street.

FOOTPATH: Efkarpidis Street (southern side) from Hinder Street to approximately 60 metres east of Hinder Street towards Kate Crace Street.



Building construction works associated with the development of Block 1, Section 227 Gungahlin.

Notification date: 16 May 2017
7 am – 5 pm (daily) Monday to Saturday on periodic days as required from Wednesday 13 September 2017 to Saturday 31 March 2018.GungahlinFOOTPATH / VERGE: O’Brien Place (northern side) from Crinigan Circle to the driveway of 4 O’Brien Place.

Building construction works associated with the Gungahlin veterinary hospital extension project.

Notification date: 06 Sep 2017
7 am Tuesday 31 October 2017 to 5 pm Wednesday 31 October 2018.Gungahlin - NgunnawalSHARED USE PATH: Anthony Rolfe Avenue / Mirrabei Drive (western side) at the intersection of Gundaroo Drive.

Works associated with the Gundaroo Drive duplication project.

Notification date: 31 Oct 2017
7 am Wednesday 22 November 2017 to 5 pm Tuesday 20 November 2018.KambahFOOTPATH / VERGE: O’Halloran Circuit (western side) from the pedestrian refuge crossing located 25 metres north of Snodgrass Crescent to the temporary footpath connection to bus stop 100.

Construction of new driveways and off site works associated with the development of Block 4, Section 239 Kambah.

Notification date: 22 Nov 2017
Works will be undertaken between 7 am Monday 23 October 2017 to 5 pm Saturday 31 March 2018.Kambah

FOOTPATH / VERGE: Snodgrass Crescent (northern side) from the driveway of 19 Snodgrass Crescent to O’Halloran Circuit.

O’Halloran Circuit (western side) from the pedestrian refuge crossing located 25 metres north of Snodgrass Crescent to the temporary footpath connection to bus stop 100.

Only one footpath closure will be implemented at any given time.

Construction of new driveways and off site works associated with the development of Block 4, Section 239 Kambah.

Notification date: 20 Oct 2017
Shall remain closed until 7 am Wednesday 7 March 2018.KingstonFOOTPATH / NATURE STRIP: Honeysett View (southern side) between The Causeway and the pedestrian crossing. Kerridge Street (northern side) from approximately 40 metres west of The Causeway to approximately 110 metres east of Honeysett View.

Building construction works associated with the development of Block 3, Section 66 Kingston.

Notification date: 10 May 2017
6 am Wednesday 31 May 2017 to 6 pm Friday 1 June 2018.KingstonFOOTPATH / NATURE STRIP: Parbery Street (eastern side) from Percy Douglas Lane to Dawes Street. Dawes Street (southern side) from Parbery Street to The Causeway.

Building construction works associated with the redevelopment of Block 1, Section 60 Kingston.

Notification date: 24 May 2017
6 am Wednesday 8 November 2017 to 7 pm Tuesday 23 October 2018.KingstonFOOTPATH/ NATURE STRIP: Kennedy Street (southern side) from the driveway of 14 Kennedy Street to Eyre Street. Eyre Street (western side) from Kennedy Street to approximately 60 metres south towards Leichhardt Street.

Building construction works associated with the redevelopment of Block 1, Section 20 Kingston.

Notification date: 07 Nov 2017
6 am Monday 20 November 2017 to 6 pm Monday 1 April 2019.Kingston

FOOTPATH / VERGE: Parbery Street (eastern side) from Cunningham Street to the southern side of Charles Francis Lane

Dawes Street (southern side) from the western side of Parbery Street to The Causeway.



Building construction works associated with the development of Block 1, Section 60 Kingston.

Notification date: 22 Nov 2017
6 am Monday 20 November 2017 to 6 pm Monday 1 April 2019.KingstonFOOTPATH / VERGE: Parbery Street (eastern side) from Cunningham Street to the southern side of Charles Francis Lane. Dawes Street (southern side) from the western side of Parbery Street to The Causeway.

Building construction works associated with the development of Block 1, Section 60 Kingston.

Notification date: 21 Nov 2017
7 am Friday 22 September 2017 to 6 pm Monday 17 September 2018.LawsonFOOTPATH / VERGE: Nevertire Street (western side) from outback Street to approximately 85 metres south of Outback Street.

Building construction works associated with the development of Block 1, Section 22 Lawson.

Notification date: 22 Sep 2017
9 am Monday 15 January 2018 to 4 pm Sunday 25 March 2018.Lyneham

FOOTPATH: Mouat Street (southern side) from the eastern side of Goodwin Street to the eastern side of the Sullivans Creek signalised pedestrian crossing.

Mouat Street (southern side) from the western side of the Sullivans Creek signalised pedestrian crossing to Brigalow Street.



Mouat Street shared path construction.

Notification date: 29 Nov 2017
7 am Monday 1 May 2017 to 5 pm Tuesday 1 May 2018.MonashSHARED USE PATH/ PUBLIC OPEN SPACE: Located at the eastern end of the Isabella Weir.

Works associated with the Isabella Weir upgrade project.

Notification date: 05 Apr 2017
7 am Friday 26 May 2017 to 5 pm Sunday 1 July 2018.PhillipVERGE: Mower Place (southern side) from Tank Street to Easty Street.

Building construction works associated with the development of Block 26, Section 158 Phillip.

Notification date: 31 May 2017
7 am Wednesday 15 November 2017 to 5 pm Wednesday 28 February 2018.PhillipFOOTPATH: Launceston Street (western side) from Yamba Drive to approximately 135 metres south of Yamba Drive towards Easty Street.

Construction of a new access road associated with the development of Block 17, Section 79 Phillip.

Notification date: 15 Nov 2017
7 am 8 November 2017 to 6 pm Thursday 31 October 2019.PhillipFOOTPATH: Irving Street (western side) from Irving Street to approximately 80 metres north towards the Southern Cross health club car park.

Building construction works associated with the redevelopment of Block 8, Section 24 Phillip.

Notification date: 09 Nov 2017
7 am Monday 31 July 2017 to 5 pm Friday 15 June 2018.Red Hill

FOOTPATH / NATURE STRIP:

Cygnet Crescent (southern side) from La Perouse Street to Endeavour Street.

Cygnet Crescent (northern side) from La Perouse Street to Monaro Crescent.

Lady Nelson Place (eastern and western sides) form Discovery Street to Cygnet Crescent.

Please note only one footpath will be closed at any given time on Lady Nelson Place.

Demolition of Red Hill housing precinct.

Notification date: 21 Jul 2017
6 am Saturday 20 January 2018 to 6 pm Monday 1 June 2020.ReidFOOTPATH: Kogarah Lane (western side) from Boolee Street to Ainslie Avenue.

Building construction works associated with the redevelopment of Block 2, Section 7 Reid.

Notification date: 11 Jan 2018
9 am Monday 22 January 2018 to 4.30 pm Friday 29 June 2018.ThrosbyFOOTPATH: Bettong Avenue (eastern side) from Horse Park Drive to the footpath connection located approximately 40 metres south of Kunapalari Street.

Throsby entrance feature construction works.

Notification date: 15 Jan 2018
6 am Wednesday 14 February 2018 to 8 pm Saturday 24 February 2018.TURNERFOOTPATH: Condamine Street (southern side) from Northbourne Avenue to Forbes Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 08 Feb 2018
5 pm Friday 22 December 2017 to 5 pm Wednesday 28 February 2018.WestonFOOTPATH / PEDESTRIAN CROSSING: Brierly Street (western side) from the pedestrian crossing located on the southern side of Trenerry Street to the northern side of Trenerry Street.

Weston Group Centre Stage 1 Works - Trenerry Square Weston.

Notification date: 14 Dec 2017
The ACT Government is committed to improving the accessibility of web content. To provide feedback or request an accessible version of a document please contact us or phone 13 22 81.

We acknowledge the Traditional Custodians of the ACT, the Ngunnawal people. We acknowledge and respect their continuing culture and the contribution they make to the life of this city and this region.

Bookmark and Share

Feedback | Languages | Sitemap | Jobs ACT | Privacy | Disclaimer | Copyright Page last updated on 17 March 2016