LocationNameDescriptionStatus
CentralDickson bus station A new bus station on Cape Street between Northbourne Avenue and Challis Street. Completed in the last 12 months
Kingston Group Centre The walking and cycling facilities in and around the Kingston Group Centre will be upgraded to provide better connections that make walking and cycling the easy choice and improve safety for these users. Completed in the last 12 months
Majura link road Link road between Majura Road and the Majura Parkway. Underway
BelconnenAikman Drive duplication Duplication of Aikman Drive from Emu Bank to Ginninderra Drive. Underway
GungahlinGungahlin town centre Over the next 12 months Gungahlin’s town centre and road network will be transformed. Underway
Gundaroo Drive stage 2  duplication  Duplication of Gundaroo Drive from Gungahlin Drive to the Barton Highway. To commence in early 2018
Mirrabei Drive/Gundaroo Drive/Anthony Rolfe Avenue intersection signalisation  Replacement of the existing roundabout with traffic lights including full pedestrian provisions. Underway
Gundaroo Drive stage 1 duplication Duplication of Gundaroo Drive from Gungahlin Drive to Mirrabei Drive/Anthony Rolfe Avenue. Underway
Gungahlin Bus Station A new bus station to provide efficient interchange opportunities around the Gungahlin Town Centre. Underway
Horse Park Drive  duplication stage 2 - Anthony Rolfe Avenue to Mulligans Flat Road Duplication of Horse Park Drive between Anthony Rolfe Avenue and Mulligans Flat Road. Underway
Mirrabei Drive, Ngunnawal temporary diversionA temporary diversion will be in place for traffic travelling towards the Gungahlin town centre in the southbound direction to allow for the installation of electrical infrastructure.Underway
Barton Highway/ Gundaroo Drive/ William Slim Drive Intersection signalisation and an additional lane on approach to and through the intersection. Completed in the last 12 months
TuggeranongAshley Drive duplication Duplication of Ashley Drive from Erindale Drive to Johnson Drive. Underway
Erindale Group Centre - Gartside Street south improvements  Improvement works to Gartside Street in the Erindale Shopping Centre which could include additional car parking, pedestrian paths and associated infrastructure. Underway
Isabella Weir and Wetlands

This project involves three separate improvements to the Isabella Pond precinct:

  1. Construction of the Isabella Wetlands as part of the ACT Healthy Waterways project
  2. Widening of Isabella Weir
  3. A carp management project in Upper Stranger and Isabella Ponds

These works require Isabella Pond to be drained for approximately 18 months. The projects have therefore been timed to run simultaneously so only one pond draining event is required. This has been done to minimise impacts on residents and pond users.

Underway
Weston Creek, Woden & MolongloCotter Road duplication stage 2 Duplication of Cotter Road from Yarralumla Creek to the Tuggeranong Parkway. Underway
Weston Creek Group Centre Brierly Street and Trenerry Square upgrade to make the area more comfortable, inviting and usable. Completion of the project is anticipated for 2017.
Woden Town Centre Active Travel improvements - Matilda Street separated cycleway This upgrade project will widen the northern verge of Matilda Street to improve the existing verge, provide a separated cycleway, new footpath and landscaping with new street trees. Construction is underway and is scheduled to be complete in November 2017.
John Gorton Drive 3A

This first part of the Molonglo 3 Roads and Infrastructure package includes the following works:

  • Upgrade 900m of Coppins Crossing Road (south of William Hovell Drive) to a dual carriageway. The upgraded road will be known as John Gorton Drive (Stage 3A).
  • Upgrade and signalise the intersection of John Gorton Drive (Stage 3A) and William Hovell Drive.
  • Build a new signalised intersection on John Gorton Drive (Stage 3A) for access to new areas of Molonglo, including the future suburb of Whitlam.
  • Construct a 600mm water main along William Hovell Drive and John Gorton Drive.
Construction is underway and is scheduled to be complete by late 2018

*Please note that this is not a complete list of all capital works road, intersection and path upgrades.

Other projects:

The ACT Government is committed to improving the accessibility of web content. To provide feedback or request an accessible version of a document please contact us or phone 13 22 81.

We acknowledge the Traditional Custodians of the ACT, the Ngunnawal people. We acknowledge and respect their continuing culture and the contribution they make to the life of this city and this region.

Bookmark and Share

Feedback | Languages | Sitemap | Jobs ACT | Privacy | Disclaimer | Copyright Page last updated on 13 November 2017