Transport Canberra and City Services


Temporary Road Closures

For up-to-date information on road closures due to adverse weather conditions please visit the TCCS media release page.

For up to date information please subscribe to the temporary road closure RSS feed.

For information on emergency road closures and the road resurfacing program visit TCCS media releases. For information on National Capital Authority (NCA) road closures visit NCA.

Notice is hereby given pursuant to Section 11 of the Public Unleased Land Act 2013, of the intention to close the following roads in the ACT.

Date / TimeSuburbLocation / Reason
From 7 am Monday 17 October 2016 until further notice.ActonPUBLIC CAR PARK BLOCK 1, SECTION 75: The southern car park on the corner of Albert Street and Barrine Drive will be closed.

Works associated with City to Lake project.

Notification date: 13 Sep 2016

7 am Wednesday 14 June 2017 to 7 am Saturday 9 September 2017.

7 am Monday 23 October 2017 to 5 pm Friday 9 March 2018.

ActonBARRINE DRIVE BOTH DIRECTIONS: From the western side of the Commonwealth Avenue bridge to Albert Street.

Works associated with the West Basin redevelopment. Point Park - Phase 1.

Notification date: 08 Jun 2017

7 am Monday 3 July 2017 to 7 am Saturday 9 September 2017.

7 am Monday 23 October 2017 to 5 pm Wednesday 28 February 2018.

Acton - ParkesBARRINE DRIVE BOTH DIRECTIONS: From the car park entry / exit located approximately 140 metres east of the Commonwealth Avenue bridge to Albert Street.

Works associated with the West Basin redevelopment. Point Park - Phase 1.

Notification date: 30 Jun 2017
10 am - 2 pm (daily) Monday to Friday and 7 am -2 pm Saturday’s on periodic days as required from Wednesday 2 August 2017 to Saturday 19 January 2019.AmarooABERFOYLE STREET BOTH DIRECTIONS: From Balgarup Street to the end.

Building construction works associated with the redevelopment of Block 6, Section 114 Amaroo.

Notification date: 26 Jul 2017
10 am - 2 pm (daily) Monday to Friday and 7 am -2 pm Saturday’s on periodic days as required from Wednesday 2 August 2017 to Saturday 19 January 2019.AmarooBALGARUP STREET BOTH DURECTIONS: From Aberfoyle Street to Pioneer Street.

Building construction works associated with the redevelopment of Block 6, Section 114 Amaroo.

Notification date: 26 Jul 2017
9 am - 5 pm (daily) Monday to Friday and 7 am -12 midday Saturday’s on periodic days as required from Wednesday 2 August 2017 to Saturday 19 January 2019.AmarooPIONEER STREET WESTBOUND DIRECTION: From Emerald Way to Balgarup Street.

Building construction works associated with the redevelopment of Block 6, Section 114 Amaroo.

Notification date: 26 Jul 2017
6 am Thursday 23 March 2017 to 7 pm Thursday 20 December 2018.AmarooABERFOYLE STREET BOTH DIRECTIONS: From Mornington Street to approximately 45 metres north of Mornington Street towards Balgarup Street.

Building construction works associated with the development of Blocks 1 & 2, Section 114 Amaroo.

Notification date: 15 Mar 2017

7 pm Friday 1 December 2017 to 4 pm Saturday 2 December 2017.

7 pm Friday 8 December 2017 to 4 pm Saturday 9 December 2017.

BelconnenEASTERN VALLEY WAY (SOUTHBOUND DIRECTION): From Emu Bank to Cameron Avenue / Aikman Drive.

Crane lift of building materials onto the Wayfarer building.

Notification date: 22 Nov 2017
7 am Thursday 20 July 2017 to 6 pm Tuesday 10 July 2018.Braddon CURRONG STREET NORTH NORTHBOUND DIRECTION: From Ainslie Avenue to Batman Street.

Building construction works associated with the redevelopment of Block 2, Section 52 Braddon (former Currong Flats site).

Notification date: 13 Jul 2017
5 am – 8 pm (daily) on Saturday 25 and Sunday 26 November 2017. 5 am – 8 pm (daily) on Saturday 2 and Sunday 3 December 2017. 5 am – 8 pm (daily) on Saturday 9 and Sunday 10 December 2017.BraddonMORT STREET BOTH DIRECTIONS: From Elouera Street to approximately 100 metres north of Elouera Street towards Girrahween Street.

Tower crane removal from 40 Mort Street Braddon.

Notification date: 17 Nov 2017

5 am – 8 pm (daily) on Saturday 25 and Sunday 26 November 2017.

5 am – 8 pm (daily) on Saturday 2 and Sunday 3 December 2017.

5 am – 8 pm (daily) on Saturday 9 and Sunday 10 December 2017.

BraddonMORT STREET BOTH DIRECTIONS: From Elouera Street to approximately 100 metres north of Elouera Street towards Girrahween Street.

Tower crane removal from 40 Mort Street Braddon.

Notification date: 21 Nov 2017

10 pm Friday 1 December 2017 to 4 am Monday 4 December 2017.

10 am Friday 8 December 2017 to 4 am Monday 11 December 2017

Braddon - City - TurnerNORTHBOURNE AVENUE MEDIAN CROSSOVER: At the intersection of Barry Drive and Cooyong Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 16 Nov 2017
10 pm Friday 24 November 2017 to 4 am Monday 27 November 2017.Braddon - City - TurnerNORTHBOURNE AVENUE MEDIAN CROSSOVER: At the intersection of Barry Drive and Cooyong Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 31 Oct 2017
10 am Friday 8 December 2017 to 4 am Monday 11 December 2017.Braddon - Lyneham - TurnerNORTHBOURNE AVENUE MEDIAN CROSSOVER: At the intersection of Macarthur Avenue and Wakefield Avenue.

Works associated with the Transport Canberra Light Rail project.

Notification date: 16 Nov 2017
From 9.30 am – 3 pm (daily) Monday to Friday from Wednesday 13 December 2017 to Wednesday 20 December 2017.Bruce

BRAYBROOKE STREET BOTH DIRECTIONS: From the roundabout located approximately 265 metres north of Battye Street to Masterman Street.

KENTISH LANE BOTH DIRECTIONS: Will be closed at Braybrooke Street.

PAGET STREET BOTH DIRECTIONS: Will be closed at Braybrooke Street.

PODIUM WAY BOTH DIRECTIONS: Will be closed at Braybrooke Street.

Access to residential properties will be maintained during these works.

Resealing works.

Notification date: 21 Nov 2017
From 4.30 am to 4.30 pm on Sunday 11 February 2018.BRUCE

LEVERRIER CRESCENT:between Battye Street and Aquatic Centre.

MASTERMAN STREET: between Leverrier Crescent and the car park behind Bruce Stadium.



Sanitarium Weet-Bix Kids TRY-athlon Series 2018.

Notification date: 20 Nov 2017
6 am – 6 pm (daily) on periodic days as required Monday to Saturday from Thursday 26 October 2017 to Saturday 25 November 2017.Campbell

KALMA WAY NORTHBOUND DIRECTION: From Constitution Avenue to Pentland Street.

Creswell Street between Pentland Street / Getting Crescent and Constitution Avenue will be reopened to vehicular traffic during these works



Construction works associated with the Campbell 5 development.

Notification date: 25 Oct 2017
7 am Thursday 26 January 2017 to 1 pm Saturday 1 September 2018.CampbellPROVAN STREET SOUTHERN STUB BOTH DIRECTIONS: Will be closed at Pentland Street.

Building construction works associated with the development of block 1, Section 132 Campbell.

Notification date: 25 Jan 2017
6 am – 6 pm Monday to Saturday on periodic days as required from Monday 31 July 2017 to Saturday 23 December 2017.CampbellANZAC PARK EAST BOTH DIRECTIONS: Between Constitution Avenue and Page Street.

Building construction works associated with the development of Block 1, Section 130 Campbell.

Notification date: 26 Jul 2017
6 am Saturday 22 July 2017 to 6 pm Saturday 1 December 2018.CampbellCRESWELL STREET BOTH DIRECTIONS: From Constitution Avenue to the southern side of the driveway to The Creswell complex.

Building construction works associated with the development of Block 1, Section 133 Campbell.

Notification date: 13 Jul 2017
7 am Thursday 20 February 2017 to 5 pm Saturday 1 September 2018.CampbellPENTLAND STREET BOTH DIRECTIONS: Between Anzac Park East and Kalma Way.

Building construction works associated with the development of the Campbell 5 precinct.

Notification date: 28 Feb 2017
4.30 am to 2.30 pm on Sunday 26 November 2017.Canberra Central (rural) - City - Molonglo Valley (rural)PARKES WAY Westbound between Kings Avenue and Glenloch Interchange

Jackie Fairweather Memorial Triathlon 2017.

Notification date: 19 Sep 2017
From 6 am to 2 pm on Saturday 16 December 2017.CANBERRA CENTRAL(RURAL),CITY,MOLONGLO VALLEY (RURAL),YARRALUMLALADY DENMAN DRIVE BOTH DIRECTIONS from Forest Drive to the Parkes way entry/exit ramps at Clunies Ross Street.

Triathlon ACT – Canberra Club Triathlon 2017.

Notification date: 09 Nov 2017
6 am Thursday 1 December 2016 to 6 pm Friday 1 December 2017.City HILLSIDE LANE WESTERN ENTRANCE: Will be closed at Akuna Street.

Eclipse House building refurbishment works

Notification date: 29 Nov 2016
7 am Thursday 1 December 2016 to 6 pm Friday 30 November 2018.CityPUBLIC CAR PARK: Located on the northern side of The Street Theatre (Block 5, Section 30 City)

Site compound and construction material handling area for construction activities undertaken within the Australian National University.

Notification date: 02 Nov 2016
7 am Tuesday 27 September 2016 to 6 pm Thursday 27 September 2018.City RABAUL LANE SOUTHBOUND DIRECTION: Will be closed from Akuna Street to approximately 100 metres southwest towards Nangari Street.

Building construction works associated with the redevelopment of Block 3, Section 12 City.

Notification date: 16 Sep 2016

10 pm Friday 1 December 2017 to 4 am Monday 4 December 2017.

10 pm Friday 15 December 2017 to 4 am Monday 18 December 2017.

City NORTHBOURNE AVENUE MEDIAN CROSSOVER: At the intersection of Alinga Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 21 Nov 2017
7 am – 5 pm (daily) Monday to Friday and 7 am – 1 pm Saturday’s on periodic days as required from Monday 24 July 2017 to Saturday 1 September 2018.CoombsJOHN GORTON DRIVE SERVICE ROAD: From John Gorton Drive to Blackmore Street.

Building construction works associated with the development of Block 3, Section 37 Coombs

Notification date: 02 Aug 2017
7 am – 5 pm on periodic days as required Monday to Saturday from Thursday 6 April 2017 to Friday 29 June 2018.CoombsJOHN GORTON DRIVE SERVICE ROAD: From John Gorton Drive to Terry Connolly Street.

Building construction works associated with the development of Block 1, Section 18 Coombs.

Notification date: 30 Mar 2017
7 am Tuesday 28 November 2017 to 5 pm Thursday 30 November 2017.Cotter River (Rural)CORIN ROAD BOTH DIRECTIONS: Will be closed from approximately 45 metres on the eastern side of the Corin Dam wall.

Corin Dam bridge inspection.

Notification date: 17 Nov 2017
Will be closed on periodic days as required between the hours of 7 am - 6 pm Monday to Friday from Monday 3 July 2017 to Thursday 30 November 2017.Downer

PANTON STREET BOTH DIRECTIONS: From Swinden Street to Antill Street.

Access for local residents and businesses will be maintained at all times during these works.

Civil works associated with the Transport Canberra Light Rail project

Notification date: 22 May 2017
Will be closed on periodic days as required between the hours of 7 am - 6 pm Monday to Friday from Monday 29 May 2017 to Thursday 30 November 2017.Downer

PANTON STREET BOTH DIRECTIONS: From Atherton Street to Swinden Street.

Access for local residents will be maintained at all times during these works.

Civil works associated with the Transport Canberra Light Rail project

Notification date: 22 May 2017
8 pm – 6 am (nightly) Sunday to Thursday from Sunday 26 November 2017 to Friday 1 December 2017.DownerNORTHBOURNE AVENUE SOUTHBOUND DIRECTION): From the Barton Highway to Mouat Street / Antill Street.

Works associated with the Transport Canberra Light Rail project.

Notification date: 15 Nov 2017
10 pm Friday 17 November 2017 to 4 am Monday 20 November 2017. 10 am Friday 24 November 2017 to 4 am Monday 27 November 2017.Downer - Dickson - LynehamNORTHBOURNE AVENUE MEDIAN CROSSOVER: At the intersection of Antill Street / Mouat Street will be closed.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 09 Nov 2017
9.30 am Friday 24 November 2017 to 6 am Friday 15 December 2017.Downer - Watson

FEDERAL HIGHWAY MEDIAN CROSSOVER: At the intersection of Phillip Avenue.

PHILLIP AVENUE BOTH DIRECTIONS: From the Federal Highway to approximately 60 metres south of the Federal Highway.



Civil works associated with the Transport Canberra Light Rail project.

Notification date: 17 Nov 2017
9.30 am to 11.59 pm on the following dates: Sunday 19 November 2017. Tuesday 21 November 2017. Wednesday 24 January 2018. Saturday 17 February 2018.Forrest - Griffith

FITZROY STREET between Empire Circuit and Manuka Circle.

MANUKA CIRCLE between New South Wales Crescent and Canberra Avenue.

CAR PARK between Manuka Pool and Manuka Arts Centre

OXLEY STREET westbound between Giles Street and Manuka Circle.



Manuka Oval Events.

Notification date: 26 Oct 2017
9.30 am – 4 pm (daily Monday to Friday and 7 am – 6 pm Saturday’s from Monday 13 November 2017 to Saturday 9 December 2017.Franklin - GungahlinMANNING CLARK CRESCENT (NORTH) BOTH DIRECTIONS: From Flemington Road to Anthony Rolfe Avenue. MANNING CLARK CRESCENT (SOUTH) BOTH DIRECTIONS: From Flemington Road to The Valley Avenue. Please note only one road closure will be implemented at any given time during these works.

Works associated with the Transport Canberra Light Rail project.

Notification date: 10 Nov 2017
6 am Monday 7 August 2017 to 8 pm Tuesday 1 January 2019.FyshwickBEACONSFIELD STREET / TOM PRICE STREET (NORTHBOUND DIRECTION): From The Iron Knob Street / Tom Price Street roundabout to approximately 125 metres southeast of Lenora Street.

Building construction works associated with the development of Blocks 3 & 4, Section 85 Fyshwick

Notification date: 02 Aug 2017
Road closure dates and times are listed with the road closure locations.Gowrie - Monash

ASHLEY DRIVE BOTH DIRECTIONS: From Bugden Avenue to Statton Street.

CLIVE STEELE AVENUE BOTH DIRECTIONS: From Sturdee Crescent to Ashley Drive.

TIME: 7 pm Friday 24 November 2017 to 7 am Saturday 25 November 2017.

CLIVE STEELE AVENUE BOTH DIRECTIONS: From Sturdee Crescent to Ashley Drive.

TIME: 7 am Saturday 25 November 2017 to 3 pm Saturday 2 December 2017.



Installation of a new watermain associated with the Ashley Drive upgrade – Stage 2.

Notification date: 17 Nov 2017
7 pm Friday 24 November 2017 to 7 am Saturday 25 November 2017.Gowrie - MonashASHLEY DRIVE BOTH DIRECTIONS: From Bugden Avenue to Clive Steele Crescent.

Installation of a new watermain associated with the Ashley Drive upgrade – Stage 2.

Notification date: 15 Nov 2017
6 pm Wednesday 16 November 2016 to 6 pm Thursday 30 November 2017.GreenwaySHARED USE PATH / VERGE: Athllon Drive (western side) from Soward Way to the Reed Street North.

Building construction works associated with the Tuggeranong Office park development.

Notification date: 08 Dec 2016
From Monday 28 November 2016 between sunset and sunrise, until further notice. Please note access for emergency and maintenance vehicles will be maintained at all times.GreenwayBARTLETT PLACE adjacent to number 25 Bartlett Place.

To prevent illegal dumping and vandalism in the area

Notification date: 29 Nov 2016
Will be permanently closed from 6 am Monday 10 April 2017.Gungahlin

HIBBERSON STREET BOTH DIRECTIONS:

From Gungahlin Place (east) to Hinder Street.

From Hinder Street to Kate Crace Street.



Works associated with the Transport Canberra Light Rail project

Notification date: 03 Apr 2017
7 am Wednesday 4 October 2017 to 5 pm Friday 9 February 2018.Gungahlin GUNGAHLIN PLACE (EAST & WEST) BOTH DIRECTIONS: From Ernest Cavanagh Street to Hibberson Street.

Construction works associated with the Gungahlin Bus Station project.

Notification date: 22 Sep 2017
8 pm – 6 am (nightly) on periodic nights as required Sunday to Thursday from Sunday 10 December 2017 to Friday 22 December 2017.Gungahlin (Rural) - Lyneham - Mitchell

FLEMINGTON ROAD BOTH DIRECTIONS: From Sandford Street / Morisset Road to the Federal Highway.

RANDWICK ROAD BOTH DIRECTIONS: Will be closed from approximately 140 metres west of Flemington Road to Flemington Road.



Light rail vehicle delivery associated with the Transport Canberra Light Rail project.

Notification date: 24 Nov 2017
Road closure dates and times are listed with the road closure locations.Gungahlin (Rural) - Mitchell

FLEMINGTON ROAD NORTHBOUND DIRECTION: From Morisset Road / Sandford Street to Well Station Drive.

LYSAGHT STREET WESTBOUND DIRECTION: From Darling Street to Flemington Road.

TIME: 8 pm – 6 am (nightly) Sunday to Thursday from Sunday 26 November 2017 to Friday 1 December 2017.

FLEMINGTON ROAD SOUTH BOUND DIRECTION: From Well Station Drive to Morisset Road / Sandford Street.

TIME: 8 pm – 6 am (nightly) Sunday 26 November 2017 and 11 pm – 6 am (nightly) Monday 27 November to Friday 1 December 2017.



Civil works associated with the Transport Canberra Light Rail project.

Notification date: 17 Nov 2017
8 pm Sunday 12 November 2017 to 6 pm Saturday 9 December 2017.Gungahlin (rural) - MitchellFLEMINGTON ROAD MEDIAN CROSSOVER: At the intersection of Sandford Street / Morisset Road.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 31 Oct 2017
Monday 12 September 2016 until further notice.HarmanWOODS LANE approximately 1km southbound from Willmetts Street

To prevent illegal dumping and vandalism in the area.

Notification date: 02 Sep 2016
9.30 am – 6 pm (daily) Monday to Friday from Thursday 16 November 2017 to Wednesday 22 November 2017.HarrisonFLEMINGTON ROAD SERVICE ROAD (SOUTHBOUND DIRECTION) From Topra Street to Flemington Road.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 10 Nov 2017
Shall remain closed until 5 pm Friday 15 December 2017.Jervis BayBOORALA ROAD (SOUTH): Will be closed at Wreck Bay Road.

Bushfire remediation works.

Notification date: 24 Oct 2017
From 6 pm to 1 am daily on Friday 1 December to Thursday 28 December 2017.KAMBAHBISSENBERGER CRESCENT Southbound lane between Brownsmith Crescent and Mannheim Street.

Christmas lights display

Notification date: 20 Nov 2017
Dates and times for the road closures are listed with road closure locations.Kingston

PARBERY STREET BOTH DIRECTIONS: From Cunningham Street to Waygoose Street.

PERCY DOUGLAS LANE: Will be closed at Parbery Street.

TIME: 6 am Monday 20 November 2017 to 6 pm Monday 4 December 2017.

PARBERY STREET BOTH DIRECTIONS: From Waygoose Street to Dawes Street.

CHARLES FRANCIS LANE: Will be closed at Parbery Street.

TIME: 6 am Monday 4 December 2017 to 6 pm Thursday 21 December 2017.



Installation of sewer and stormwater services associated with the development of Block 1, Section 60 Kingston.

Notification date: 10 Nov 2017
6 am – 6 pm (daily) Monday to Saturday on periodic days as required from Monday 20 November 2017 to Monday 1 April 2019.Kingston

DAWES STREET BOTH DIRECTIONS: From Parbery Street to The Causeway.

CUNNINGHAM STREET BOTH DIRECTIONS: From Parbery Street to The Causeway.

PARBERY STREET BOTH DIRECTIONS: From Cunningham Street to Waygoose Street.

PERCY DOUGLAS LANE: Will be closed at Parbery Street.

PARBERY STREET BOTH DIRECTIONS: From Waygoose Street to Dawes Street.

CHARLES FRANCIS LANE: Will be closed at Parbery Street.

Only one closure of either Dawes Street, Cunningham Street or Parbery Street will be implemented at any given time.



Building construction works associated with the development of Block 1, Section 60 Kingston

Notification date: 17 Nov 2017
6 am – 6 pm (daily on periodic days as required Monday to Saturday from Wednesday 31 May 2017 to Friday 1 June 2018.KingstonDAWES STREET BOTH DIRECTIONS: Between The Causeway and Parbery Street.

Building construction works associated with the redevelopment of Block 1, Section 60 Kingston.

Notification date: 24 May 2017
6 am – 6 pm (daily) Monday to Saturday on periodic days as required from Thursday 2 February 2017 to Saturday 23 December 2017.LawsonNEVERTIRE STREET BOTH DIRECTIONS: From Wanderlight Avenue to Outback Street.

Building construction works associated with the development of Block 2, Section 22 Lawson.

Notification date: 25 Jan 2017
7 am – 5 pm (daily) Monday to Saturday on periodic days as required from Friday 22 September 2017 to Saturday 30 December 2017.LawsonWANDERLIGHT AVENUE BOTH DIRECTIONS: From Outback Street to Nevertire Street.

Building construction works associated with the development of Block 3, Section 21 Lawson

Notification date: 22 Sep 2017
7 am Wednesday 23 August 2017 to 6 pm Sunday 31 December 2017.LynehamRANDWICK ROAD BOTH DIRECTIONS: From Flemington Road to approximately 120 metres west of Flemington Road.

Civil works associated with the Transport Canberra Light Rail project

Notification date: 11 Aug 2017
7 am Tuesday 9 January 2018 to 6 pm Thursday 25 January 2018.Lyneham

FEDERAL HIGHWAY NORTHBOUND DIRECTION: From Phillip Avenue to Flemington Road.

FLEMINGTON ROAD NORTHBOUND DIRECTION: From Federal Highway to Randwick Road.



Works associated with the Transport Canberra Light Rail project.

Notification date: 24 Nov 2017
8 pm – 6 am (nightly) Sunday to Thursday from Sunday 12 November 2017 to Friday 24 November 2017.LynehamFEDERAL HIGHWAY NORTHBOUND DIRECTION): From Barton Highway to Flemington Road.

Works associated with the Transport Canberra Light Rail project.

Notification date: 24 Oct 2017
8 pm – 6 am (nightly) Sunday to Thursday from Sunday 3 December 2017 to Friday 8 December 2017.Lyneham

NORTHBOURNE AVENUE NORTHBOUND DIRECTION): From Mouat Street / Antill Street to the Barton Highway.

THURBON ROAD BOTH DIRECTIONS: Will be closed at Northbourne Avenue.



Works associated with the Transport Canberra Light Rail project.

Notification date: 15 Nov 2017
9.30 am Monday 4 December 2017 to 4 pm Thursday 7 December 2017.Lyneham

DE BURGH STREET SOUTHBOUND DIRECTION: From Owen Crescent (south) to Wattle Street.

Driveway access to the rear of 241 & 243 Northbourne Avenue off De Burgh Street will be maintained during these works.



Civil works associated with the Transport Canberra Light Rail project.

Notification date: 16 Nov 2017
6 am - 6 pm Monday to Saturday on periodic days as required from Monday 15 May 2017 to Saturday 5 May 2018.Macquarie

HENSHALL WAY BOTH DIRECTIONS: Will be closed from approximately 15 metres east of Bowman Street to the Jamison Centre access road.

PUBLIC UNNAMED ROAD: Located on the eastern side of the Jamison Centre access road to approximately 25 metres east of the Jamison Centre access road.



Concrete pours associated with the redevelopment of Block 47, Section 50 Macquarie (former Old Jamison Inn site).

Notification date: 12 May 2017
9.30 pm to 11.59 pm on Tuesday 5 December 2017.MITCHELL

FLEMINGTON ROAD between Federal Highway and Sandford Street.

FLEMINGTON ROAD northbound between Sandford Street and Lysaght Street.

SANDFORD STREET eastbound between Flemington Road and Darling Street.

DARLING STREET between Sandford Street and Lysaght Street.

LYSAGHT STREET between Flemington Road and Vicars Street.

VICARS STREET between Lysaght Street and Callan Street.

CALLAN STREET at Vicars Street.



Movement of Navy Seahawk Helicopter.

Notification date: 20 Nov 2017
7 am Monday 20 November 2017 to 5 pm Friday 24 November 2017.PhillipPARRAMATTA STREET WESTBOUND DIRECTION: From Salamander Street (east) to Townshend Street.

Pavement repairs.

Notification date: 09 Nov 2017
7 am Friday 26 May 2017 to 5 pm Sunday 1 July 2018.PhillipEASTY STREET BOTH DIRECTIONS: Will be closed approximately 40 metres south of Mower Place.

Building construction works associated with the development of Block 26, Section 158 Phillip.

Notification date: 31 May 2017
7 am 8 November 2017 to 6 pm Thursday 31 October 2019.PhillipIRVING STREET BOTH DIRECTIONS: From Irving Street to approximately 80 metres north towards the Southern Cross health club car park.

Building construction works associated with the redevelopment of Block 8, Section 24 Phillip.

Notification date: 09 Nov 2017
7 am Monday 31 July 2017 to 5 pm Friday 15 June 2018.Red Hill

CYGNET CRESCENT BOTH DIRECTIONS: From La Perouse Street to Endeavour Street.

LADY NELSON PLACE BOTH DIRECTIONS: From Discovery Street to Cygnet Crescent.

NORFOLK STREET BOTH DIRECTIONS: From the driveway to house number 4 Norfolk Street to Cygnet Crescent.

UNNAMED ROADS BOTH DIRECTIONS: From approximately 50 metres north of Beagle Street to Cygnet Crescent.



Demolition of Red Hill housing precinct.

Notification date: 21 Jul 2017
9.30 am – 4 pm Monday to Friday and 7 am – 6 pm Saturday’s on periodic days as required from Tuesday 7 November 2017 to Friday 22 December 2017.WatsonPHILLIP AVENUE SOUTHBOUND DIRECTION: Will be closed from the Federal Highway to Briggs Street.

Civil works associated with the Transport Canberra Light Rail project

Notification date: 31 Oct 2017
From 9.30 am – 3 pm (daily) Monday to Friday from Monday 11 December 2017 to Wednesday 20 December 2017.WestonMCINNES STREET BOTH DIRECTIONS: From Hindmarsh Drive to Buvelot Street (south).

Resealing works.

Notification date: 21 Nov 2017
7 am Wednesday 9 August 2017 to 5 pm Sunday 24 December 2017.WestonTRENERRY STREET BOTH DIRECTIONS: From Brierly Street to approximately 50 metres west of Brierly Street towards Liardet Street.

Weston Group Centre Stage 1 Works - Trenerry Square Weston.

Notification date: 03 Aug 2017
From 7 am Tuesday 5 September 2017 until early 2018.WhitlamWILLIAM HOVELL DRIVE at COPPINS CROSSING ROAD: Spare lanes will be closed outside of peak hours. One lane in each direction will remain open at all times.

Works associated with the construction of John Gorton Drive at Whitlam, installing utility crossings, followed by kerb and pavement works.

Notification date: 05 Sep 2017

Barriers, warning and diversion signs to be erected on site. For more information contact Access Canberra on 13 22 81.

The ACT Government is committed to improving the accessibility of web content. To provide feedback or request an accessible version of a document please contact us or phone 13 22 81.

We acknowledge the Traditional Custodians of the ACT, the Ngunnawal people. We acknowledge and respect their continuing culture and the contribution they make to the life of this city and this region.

Bookmark and Share

Feedback | Languages | Sitemap | Jobs ACT | Privacy | Disclaimer | Copyright Page last updated on 18 August 2017