Transport Canberra and City Services


Community Paths

Date / TimeSuburbLocation / Reason
5 pm Wednesday 28 February 2018 to 5 pm Saturday 28 April 2018.ACTON – PARKES

SHARED USE PATH: Barrine Drive both sides from approximately 75 metres on the eastern side of Commonwealth Avenue to Corkhill Street.

Connection from the Commonwealth Avenue (northbound) northern bridge abutment to Barrine Drive.

FOOTPATH: Albert Street (southern side from Commonwealth Avenue to Barrine Drive.



Works associated with the West Basin redevelopment. Point Park - Phase 1.

Notification date: 22 Feb 2018
7 am Wednesday 2 May 2018 to 5 pm Saturday 30 June 2018.AMAROO
  • FOOTPATH / VERGE: Aberfoyle Street (western side) from Mornington Street to approximately 15 metres north towards Pioneer Street.
  • FOOTPATH / VERGE: Mornington Street (northern side) from Aberfoyle Street to approximately 15 metres west towards Balgarup Street.

Access to residential properties located at 28 Mornington Street will be maintained at all times.



LV electrical supply installation.

Notification date: 01 May 2018
7 am Friday 15 September 2017 to 5 pm Wednesday 30 May 2018.Amaroo

FOOTPATH / VERGE: Horse Park Drive Service road (southern side) from Emerald Way to Crossman Street

Pioneer Street (northern side) from Emerald Way to Crossman Street.



Building construction works associated with the development of Block 1, Section 110 Amaroo

Notification date: 14 Sep 2017
6 am Thursday 23 March 2017 to 7 pm Thursday 20 December 2018.AmarooPUBLIC OPEN SPACE / FOOTPATHS: Located within Blocks 3, 4 & 5, Section 114 Amaroo.

Building construction works associated with the development of Blocks 1 & 2, Section 114 Amaroo.

Notification date: 15 Mar 2017
7 am Thursday 23 November 2017 to 5 pm Sunday 30 December 2018.AmarooFOOTPATH: Horse Park Drive (western side) located on either side of Katherine Avenue (South).

Works associated with the Horse Park Drive duplication project.

Notification date: 15 Nov 2017
Will remain closed until 7 pm Thursday 20 December 2018.Amaroo

FOOTPATH / NATURE STRIP: Pioneer Street (southern side) from the pedestrian crossing located on the western side of Emerald Way to Balgarup Street.

Balgarup Street (eastern side) from Pioneer Street (northern side) to Aberfoyle Street.

Aberfoyle Street (northern side) from Balgarup Street to the public open space located on Block 5, Section 114.



Building construction works associated with the development of Blocks 1 & 2, Section 114 Amaroo.

Notification date: 15 Mar 2017
7 am Monday 13 February 2017 to 6 pm Wednesday 1 August 2018Amaroo

FOOTPATH / VERGE: Emerald Way (eastern side) from Horse Park Drive to Pioneer Street.

Crossman Street (western side) from Horse Park Drive to Pioneer Street.



Building construction works associated with the development of Block

Notification date: 13 Feb 2017
9.30 am – 4.30 pm (daily) Monday to Friday on periodic days as required from Monday 4 June 2018 to Friday 29 June 2018.BARTON
  • FOOTPATH / VERGE: Macquarie Street (eastern side) from Kings Avenue to the pedestrian crossing located approximately 35 metres north of Broughton Street.


Crane lift.

Notification date: 30 May 2018
9.30 am Friday 15 June 2018 to 4 pm Monday 16 July 2018.BELCONNEN
  • SIGNALISED PEDESTRIAN CROSSING: Emu Bank (southern side) from the eastern side of Eastern Valley Way to the western side of Eastern Valley Way.


Gross pollutant trap cleaning.

Notification date: 13 Jun 2018
6 am Tuesday 29 May 2018 to 7 pm Wednesday 1 August 2018.BELCONNEN
  • FOOTPATH / VERGE: Emu Bank (southern side) from Eastern Valley Way to Cohen Street.


Sewer main connection works associated with the development of Block 2, Section 200 Belconnen.

Notification date: 22 May 2018
6 am Monday 30 April 2018 to 7 pm Thursday 30 April 2020.BELCONNEN
  • FOOTPATH / VERGE: Edmonstone Place (eastern side) from the car park entry exit to Cameron Avenue.
  • FOOTPATH / VERGE: Cameron Avenue (northern side) from Edmonstone Place to the car park entry exit located approximately 50 metres east of Edmonstone Place.


Building construction works associated with the development of Block 2, Section 200 Belconnen.

Notification date: 23 Apr 2018
9 am Monday 19 February 2018 to 4 pm Monday 23 April 2018.BelconnenFOOTPATH: Chandler Street (western side) from the pedestrian crossing located on the northern side of Cohen Street to the southern side of Cohen Street. This closure also includes the stairs from Chandler Street down to Cohen Street located on the southern side of Cohen Street.

Chandler Street bridge abutment works.

Notification date: 13 Feb 2018
7 am Tuesday 23 May 2017 to 6 pm Monday 15 July 2019.BelconnenFOOTPATH / VERGE: Emu Bank (southern side) from Benjamin Way to Beissel Street.

Building construction works associated with the redevelopment of Block 37, Section 52 Belconnen.

Notification date: 16 May 2017
7 am Saturday 1 July 2017 to 6 pm Wednesday 1 July 2020.Belconnen.

FOOTPATH: Cameron Avenue (northern side) from Chandler Street to Edmondstone Place.

Chandler Street (eastern side) from Cameron Avenue to approximately 55 metres north of Cameron Avenue.



Building construction works associated with the redevelopment of Blocks 8 & 9, Section 48 Belconnen.

Notification date: 21 Jun 2017
7 am Friday 23 March 2018 to 5 pm Saturday 30 June 2018.BONNERFOOTPATH / VERGE: Mulligans Flat Road (northern side) from Horse Park Drive to approximately 80 metres east of Horse Park Drive towards Mabo Boulevard.

Works associated with the Horse Park Drive duplication project.

Notification date: 23 Feb 2018
6 pm Friday 23 February 2018 to 6 pm Monday 23 April 2018.BraddonFOOTPATH: Mort Street (eastern side) adjacent to 32 Mort Street.

Excavation works associated with the redevelopment of Block 3, Section 28 Braddon.

Notification date: 07 Sep 2017
6 am Monday 26 February 2018 to 8 pm Thursday 31 May 2018.BRADDONFOOTPATH: Mort Street (western side) from Elouera Street to approximately 40 metres south of Elouera Street towards Cooyong Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 19 Feb 2018
6 am Monday 26 February 2018 to 6 pm Thursday 26 April 2018.BRADDONFOOTPATH: Elouera Street (southern side) from Torrens Street to approximately 25 metres west towards Lonsdale Street.

ICON Water service connection associated with the redevelopment of Block 1, section 29 Braddon

Notification date: 19 Feb 2018
6 am Friday 1 December 2017 to 6 pm Friday 19 April 2019.BraddonFOOTPATH: Mort Street (western side) from Elouera Street to approximately 100 metres north of Elouera Street towards Girrahween Street.

Building construction works associated with the redevelopment of Blocks 7, 8 & 9, Section 19 Braddon (former NRMA building).

Notification date: 16 Nov 2017
7 am Thursday 20 July 2017 to 6 pm Tuesday 10 July 2018.Braddon

FOOTPATH / VERGE:

From Cooyong Street to Currong Street (North).

Currong Street (North) western side from Ainslie Avenue to the unnamed road located approximately 115 metres south of Donaldson Street.



Building construction works associated with the redevelopment of Block 2, Section 52 Braddon (former Currong Flats site).

Notification date: 13 Jul 2017
7 am – 6 pm (daily) Monday to Saturday and 8 am – 6 pm Sundays on periodic days as required from Wednesday 20 June 2018 to Monday 20 April 2020.BRADDONFOOTPATH / VERGE: Donaldson Street (northern side) from Cooyong Street to the eastern side of Currong Street (North).

Building construction works associated with the redevelopment of Block 5, Section 30 Braddon.

Notification date: 14 Jun 2018
7 am Wednesday 13 June 2018 to 6 pm Friday 7 June 2019.BRADDON
  • FOOTPATH: Cooyong Street (western side) from the signalised pedestrian crossing located on the southern side of Ainslie Avenue to the signalised pedestrian crossing located on the northern side of Petrie Street.
  • SIGNALISED PEDESTRIAN CROSSING: Cooyong Street (northern side) from the western side to the eastern side of Ainslie Avenue.


Building construction works associated with the construction of Block 2, Section 52 Braddon.

Notification date: 13 Jun 2018
8 pm Thursday 5 April 2018 to 6 am Friday 6 April 2018BRADDON - CITY - TURNERSIGNALISED PEDESTRIAN CROSSING: Northbourne Avenue (northern and southern side) at the intersection of Barry Drive and Cooyong Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 29 Mar 2018

10 pm Friday 6 April 2018 to 4 am Monday 9 April 2018.

10 pm Friday 13 April 2018 to 4 am Monday 16 April 2018.

BRADDON - CITY - TURNERSIGNALISED PEDESTRIAN CROSSING: Northbourne Avenue (northern and southern side) at the intersection of Barry Drive and Cooyong Street.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 23 Mar 2018
7 am Thursday 8 March 2018 to 5 pm Monday 30 April 2018.BRADDON - REID

FOOTPATH: Doonkuna Street (western side) from the northern side of Ainslie Avenue to the southern side of Ainslie Avenue.

Doonkuna Street (eastern side) from the northern side of Ainslie Avenue to the southern side of Ainslie Avenue.

Ainslie Avenue (northern side) from the western side of Doonkuna Street to the eastern side of Doonkuna Street.

Ainslie Avenue (southern side) from the western side of Doonkuna Street to the eastern side of Doonkuna Street

(These works will be staged with only one closure implemented at any given time).



Footpath construction

Notification date: 02 Mar 2018
2.30 pm Thursday 8 March 2018 to 6 pm Friday 1 June 2018.Braddon - TurnerSIGNALISED PEDESTRIAN\ CROSSING: Ipima Street and Condamine Street (northern side) at the intersection of Northbourne Avenue.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 08 Mar 2018
8 am Wednesday 13 June 2018 to 6 pm Tuesday 31 July 2018.BRADDON – TURNER
  • SIGNALISED PEDESTRIAN CROSSING: Northbourne Avenue (northern and southern side) at the intersection of Gould Street and Elouera Street.


Civil works associated with the Transport Canberra Light Rail project.

Notification date: 13 Jun 2018

8 pm Friday 29 June 2018 to 4 am Monday 2 July 2018; and

8 pm Friday 6 July 2018 to 4 am Monday 9 July 2018.

BRADDON – TURNER – LYNEHAM
  • SIGNALISED PEDESTRIAN CROSSINGS: Northbourne Avenue (northern and southern side) at the intersection of Macarthur Avenue and Wakefield Avenue.


Works associated with the Transport Canberra Light Rail project.

Notification date: 15 Jun 2018
6 am Saturday 22 July 2017 to 6 pm Saturday 1 December 2018.Campbell

FOOTPATH / VERGE:

Creswell Street (western side) from Constitution Avenue to Pentland Street.

Pentland Street (southern side) from Creswell Street to Kalma Way.

Kalma Way (both sides) from Constitution Avenue to Pentland Street.



Building construction works associated with the development of Block 1, Section 133 Campbell.

Notification date: 13 Jul 2017
7 am Thursday 26 January 2017 to 1 pm Saturday 1 September 2018.CampbellFOOTPATH / NATURE STRIP: Pentland Street (southern side) from Provan Street to Kalma Way.

Building construction works associated with the development of block 1, Section 132 Campbell.

Notification date: 25 Jan 2017
7 am Monday 4 June 2018 to 6 pm Wednesday 1 January 2020.CAMPBELL
  • FOOTPATH / VERGE: Pentland Street (southern side) from Kalma Way to Anzac Park (East).


Building construction works associated with the development of Block 1, Section 131 Campbell.

Notification date: 04 Jun 2018
7 am Wednesday 11 April 2018 to 6 pm Friday 4 May 2018.CITYOVERHEAD PEDESTRIAN FOOTBRIDGE: Located over Theatre Lane from Vernon Circle to The Canberra Theatre

Footbridge repairs.

Notification date: 26 Mar 2018

5 am – 6 pm daily:

Sunday 17 June 2018;

Saturday 23 June 2018;

Sunday 24 June 2018;

Sunday 30 June 2018; and

Sunday 1 July 2018.

CITY
  • FOOTPATH: Knowles Place (eastern & western side) will be closed from the kerb ramp located at the rear of the City Police station to the London Circuit car park entry/exit.


Crane lift of building materials associated with the ACT Law Courts project.

Notification date: 13 Jun 2018
9.30 am Monday 18 June 2018 to 4 pm Monday 2 July 2018.CITY
  • SIGNALISED PEDESTRIAN CROSSING: Northbourne Avenue (southern side) at the intersection of Bunda Street and Rudd Street.


Civil works associated with the Transport Canberra Light Rail project.

Notification date: 07 Jun 2018
9.30 am Tuesday 20 March 2018 to 6 pm Saturday 30 June 2018CitySIGNALISED PEDESTRIAN CROSSING: Alinga Street (northern side) at the intersection of Northbourne Avenue.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 14 Mar 2018
4 pm Wednesday 13 June 2018 to 5 pm Sunday 8 July 2018.CITY
  • FOOTPATH: Knowles Place (western side) will be closed from the London Circuit car park entry/exit to the ACT Supreme Court main entrance.


Landscaping works associated with the ACT Law Courts project.

Notification date: 13 Jun 2018

6 am Saturday 28 July 2018 to 6 pm Sunday 29 July 2018; and

6 am Saturday 4 August 2018 to 6 pm Sunday 5 August 2018.

CITY
  • FOOTPATH: Hobart Place (southern side) from London Circuit to approximately 60 metres west towards Marcus Clarke Street.


Tower crane installation.

Notification date: 18 Jun 2018
6 am Monday 15 May 2017 to 6 pm Wednesday 15 May 2019.City

FOOTPATH / VERGE & OFF STREET PARKING AREA: Located on the northern side of Veterans Park between Northbourne Avenue and Mort Street.

Mort Street (northern side) from Cooyong Street to the footpath on the northern side of Veterans Park.



Demolition of existing building and construction works associated with the redevelopment of Section 26 City.

Notification date: 11 May 2017
7 am Tuesday 27 September 2016 to 6 pm Thursday 27 September 2018.City

FOOTPATH: Rabaul Lane (eastern side) from Akuna Street to approximately 100 metres southwest towards Nangari Street.

PUBLIC OPEN SPACE: A section of public open space located on the podium level above Rabaul Lane adjacent to Block 3, Section 12 City will be closed.



Building construction works associated with the redevelopment of Block 3, Section 12 City.

Notification date: 16 Sep 2016
Will remain closed from 6 pm Friday 1 December 2017 to 6 pm Sunday 30 September 2018.City FOOTPATHS: On the western side of the Hillside Lane western entrance will be closed.

Eclipse House building refurbishment works

Notification date: 30 Nov 2017
3 pm Tuesday 20 February 2018 to 8 pm Thursday 31 May 2018.CitySIGNALISED PEDESTRIAN CROSSING: Bunda Street / Rudd Street (southern side) at the intersection of Northbourne Avenue.

Works associated with the Transport Canberra Light Rail project.

Notification date: 20 Feb 2018
5 pm Friday 17 June 2016 to 7 pm Thursday 20 December 2018.City

FOOTPATH / NATURE STRIP: Vernon Circle / Northbourne Avenue (northern and western side) from approximately 45 metres on the southern side of the ACT Magistrates Court to the ACT Law Courts precinct footpath connection located approximately 75 metres south of London Circuit.



Construction works associated with the ACT Law Courts project.

Notification date: 15 Apr 2016
Closure dates and times are listed with the closure locations.City

FOOTPATH: Northbourne Avenue (eastern side) from Cooyong Street to the footpath on the northern side of Veterans Park.

TIME: 6 am – 4 pm (daily) on periodic days as required Monday to Saturday from Wednesday 28 February 2018 to 4 pm Saturday 30 November 2019.

FOOTPATH / VERGE & OFF STREET PARKING AREA: Located on the northern side of Veterans Park between Northbourne Avenue and Mort Street.

Mort Street (northern side) from Cooyong Street to the footpath on the northern side of Veterans Park.

TIME: 6 am Wednesday 28 February 2018 to 4 pm Saturday 30 November 2019.



Construction works associated with the redevelopment of Section 26 City.

Notification date: 15 Feb 2018
7 am Monday 13 November 2017 to 6 pm Tuesday 13 November 2018.CoombsFOOTPATH / VERGE: Arthur Blakeley Way (northern side) from Colbung Street to Fairhall Street.

Building construction works associated with the development of Block 3, Section 41 Coombs.

Notification date: 07 Nov 2017
7 am Monday 13 November 2017 to 6 pm Tuesday 13 November 2018.CoombsFOOTPATH / VERGE: Pearlman Street (western side) from Cotter road to the pedestrian refuge crossing located approximately 75 metres south of Woodberry Avenue.

Building construction works associated with the development of Block 3, Section 2 Coombs.

Notification date: 07 Nov 2017
7 am Friday 20 April 2018 to 6 pm Friday 31 August 2018.COOMBS
  • FOOTPATH / VERGE: Harold White Avenue (western side) from John Gorton Drive to Woodberry Avenue.
  • FOOTPATH / VERGE: Woodberry Avenue (southern side) from Harold White Avenue to approximately 90 metres west towards Terry Connolly Street.


Building construction works associated with the development of Block 2, Section 12 Coombs.

Notification date: 07 Jun 2018
7 am Wednesday 19 April 2017 to 5 pm Friday 29 June 2018Coombs

FOOTPATH / NATURE STRIP: Woodberry Avenue (western side) from the pedestrian refuge crossing located approximately 80 metres north of Terry Connolly Street to Newchurch Street.



Building construction works associated with the development of Block 1, Section 18 Coombs.

Notification date: 30 Mar 2017
7.30 am Wednesday 25 October 2017 to 5.30 pm Friday 13 April 2018.Denman ProspectFOOTPATH: Wyndham Avenue (northern side) from the raised pedestrian crossing located approximately 235 metres west of Bielski Street to John Gorton Drive.

Construction of a new road.

Notification date: 25 Oct 2017
6 am Friday 4 May 2018 to 8 pm Monday 29 April 2019.DICKSON
  • FOOTPATH / VERGE: Challis Street (western side) from the pedestrian crossing located approximately 105 metres south of Antill Street to Cape Street.


Building construction works associated with the redevelopment of Block 2, Section 33 Dickson.

Notification date: 03 May 2018
7 am – 4 pm (daily) Monday to Friday and 7 am – 12 midday Saturdays on periodic days as required from Friday 27 April 2018 to Tuesday 26 March 2019.DICKSON
  • FOOTPATH / VERGE: Wakefield Avenue (northern side) from Dooring Street to Majura Avenue.


Building construction works associated with the redevelopment of Blocks 66 & 68, Section 4 Dickson.

Notification date: 27 Apr 2018

10 pm Friday 8 June 2018 to 4 am Monday 11 June 2018; and

10 pm Friday 22 June 2018 to 4 am Monday 25 June 2018.

DOWNER – DICKSON – LYNEHAM
  • SIGNALISED PEDESTRIAN CROSSING: Northbourne Avenue (northern and southern side) at the intersection of Antill Street / Mouat Street.

Please note one signalised pedestrian crossing will remain open at all times during these works.



Civil works associated with the Transport Canberra Light Rail project.

Notification date: 01 Jun 2018
7 am – 6 pm (daily) on periodic days as required Monday to Sunday from Monday 8 January 2018 to Sunday 30 September 2018.ForrestNATURE STRIP: National Circuit (northern side) in front of number 47-49

Building construction works associated with the redevelopment of Blocks 19 & 20, Section 20 Forrest

Notification date: 20 Dec 2017
5 pm Monday 14 May 2018 to 5 pm Saturday 30 June 2018.FRANKLIN
  • FOOTPATH / VERGE: Manning Clark Crescent (eastern side) from approximately 30 metres north of The Valley Avenue to approximately 115 metres north of the Marie Pitt Street / Walling Street roundabout.
  • FOOTPATH / VERGE: Barbara Jefferis Street (northern & southern sides) from Manning Clark Crescent to approximately 45 metres east towards Elizabeth Jolley Crescent.


Civil works associated with the Gungahlin Town Centre Works project.

Notification date: 03 May 2018
4 pm Thursday 29 March 2018 to 4 pm Saturday 28 April 2018.FRANKLIN - HARRISONSIGNALISED PEDESTRIAN CROSSING: Nullarbor Avenue (northern side) at the intersection of Flemington Road.

Civil works associated with the Transport Canberra Light Rail project.

Notification date: 19 Mar 2018
9.30 am Monday 9 April 2018 to 4 pm Friday 13 April 2018.FRANKLIN - HARRISON
  • SIGNALISED PEDESTRIAN CROSSING: Nullarbor Avenue (northern and southern side) at the intersection of Flemington Road.


  • Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 27 Mar 2018
    4 pm Saturday 28 April 2018 to 6 pm Saturday 30 June 2018.FRANKLIN – HARRISON
    • SIGNALISED PEDESTRIAN CROSSING: Nullarbor Avenue (northern side) at the intersection of Flemington Road.


    Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 27 Apr 2018
    6 pm Saturday 5 May 2018 to 6 pm Saturday 30 June 2018.FRANKLIN – HARRISON
    • SIGNALISED PEDESTRIAN CROSSING: Flemington Road (northern and southern side) on either side of the Manning Clark Crescent (South) / Mapleton Avenue intersection.

    Only one closure will be implemented at any given time during these works.



    Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 27 Apr 2018
    7 am Wednesday 20 June 2018 to 5 pm Saturday 7 July 2018.FYSHWICK
    • FOOTPATH / VERGE: Quilpie Crescent (southern side) from the driveway to number 33 Quilpie Crescent to approximately 25 metres west towards Cessnock Street.
    • FOOTPATH / VERGE: Cessnock Street (southern side) from the eastern side of Quilpie Crescent to approximately 65 metres west towards Newcastle Street.


    Installation of underground services associated with the development of Block 1, Section 89 Fyshwick.

    Notification date: 13 Jun 2018
    6 am Monday 7 August 2017 to 8 pm Tuesday 1 January 2019.Fyshwick

    FOOTPATH / NATURE STRIP: Beaconsfield Street / Tom Price Street (southern and western side) from approximately 125 metres southeast of Lenora Street to the Iron Knob Street / Tom Price Street roundabout.

    Iron Knob Street (northern side) from approximately 10 metres west of Geraldton Crescent (east) to Tom Price Street.



    Building construction works associated with the development of Blocks 3 & 4, Section 85 Fyshwick.

    Notification date: 02 Aug 2017
    7 am Monday 18 June 2018 to 6 pm Friday 28 September 2018.GORDON
    • SHARED USE PATH / FOOTBRIDGE: Located in the public open space within Block 3, Section 475 between Chevalley Loop and Tharwa Drive.


    Pedestrian bridge repairs.

    Notification date: 08 Jun 2018
    6 am Wednesday 24 January 2018 to 6 pm Sunday 1 July 2018.Gowrie - Monash - Richardson

    FOOTPATH: Erindale Drive (southern side) located on either side of Ashley Drive.

    Ashley Drive (eastern side) from the bus stop located on Clift Crescent between Hemmings Crescent and Ashley Drive to the footpath on the southern side of the stormwater drain located approximately 55 metres south of Isabella Drive.



    Works associated with the Ashley Drive duplication – Stage 2.

    Notification date: 24 Jan 2018

    7 am Monday 4 September 2017 to 6 pm Thursday 4 January 2018.

    7 am – 6 pm (daily) Monday to Saturday on periodic days as required from Thursday 4 January 2018 to Tuesday 4 September 2018.

    GreenwayFOOTPATH / VERGE: Cynthea Teague Crescent (northern and eastern side) from Oakden Street to Anketell Street.

    Building construction works associated with the development of Block 1, Section 79 Greenway.

    Notification date: 30 Aug 2017
    7 am – 5 pm (daily) Saturday 7, Sunday 8, Saturday 14 and Sunday 15 April 2018.GREENWAY

    SHARED USE PATH / VERGE: Athllon Drive (western side from Soward Way to approximately 210 metres north of Sowaard Way towards Pitman Street.

    SIGNALISED PEDESTRIAN CROSSINGS: Athllon Drive (northern and southern side) at the intersection of Reed Street (North).



    Site accommodation removal associated with the Tuggeranong office park construction.

    Notification date: 27 Mar 2018
    6.30 am Monday 22 May 2017 to 7 pm Monday 6 August 2018.GreenwayFOOTPATH / VERGE: Cynthia Teague Crescent (northern side) adjacent to Block 1, Section 75 Greenway

    Building construction works associated with the development of Block 1, Section 75 Greenway.

    Notification date: 19 May 2017
    9.30 am Tuesday 6 February 2018 to 3.30 pm Tuesday 31 July 2018.Greenway - MonashSHARED USE PATH: Located on the northern side of the Drakeford Drive / Athllon Drive roundabout. From the northern side of Athllon Drive to the eastern side of Drakeford Drive.

    Construction of a new watermain associated with the Isabella Weir upgrade and wetlands project

    Notification date: 06 Feb 2018
    7 am Tuesday 17 April 2018 to 6 pm Wednesday 16 October 2019.GRIFFITH
    • FOOTPATH / VERGE: Leichhardt Street (southern side) from the driveway of 76 Leichhardt Street to the rear driveway of 113 Canberra Avenue.


    Building construction works associated with the redevelopment of Block 4 Section 25 Griffith.

    Notification date: 10 Apr 2018
    7 am Thursday 8 March 2018 to 5 pm Saturday 21 April 2018.GUNGAHLIN

    FOOTPATH: Ernest Cavanagh Street (southern side) from Gungahlin Place (West) to Gungahlin Place (East).

    Hibberson Street (northern and southern side) from Gungahlin Place (West) to Gungahlin Place (East).



    Works associated with the Gungahlin Bus Station project.

    Notification date: 28 Feb 2018
    9.30 am Monday 19 February 2018 to 6 pm Saturday 30 June 2018.GUNGAHLINSHARED USE PATH: Flemington Road (northern side) from Manning Clark Crescent (North) to Kate Crace Street.

    Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 19 Feb 2018
    7 am Monday 16 April 2018 to 5 pm Thursday 31 January 2019.GUNGAHLIN
    • FOOTPATH / VERGE: Kate Crace Street (eastern and western sides) from Flemington Road to Anthony Rolfe Avenue.


    Works associated with the Ernest Cavanagh Street extension project.

    Notification date: 10 Apr 2018
    9.30 am Thursday 3 May 2018 to 6 pm Saturday 30 June 2018.GUNGAHLIN
    • SIGNALISED PEDESTRIAN CROSSING: Manning Clark Crescent (North) (western side) at the intersection of Flemington Road.


    Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 27 Apr 2018
    7 am Monday 15 January 2018 to 5 pm Saturday 2 March 2019.GungahlinFOOTPATH: Donnelly Lane (western side) from Sarre Street to Huyer Street.

    Building construction works associated with the development of Block 1, Section 68 Gungahlin.

    Notification date: 14 Dec 2017
    7 am Saturday 2 June 2018 to 4 pm 31 August 2018.GUNGAHLIN
    • FOOTPATH / VERGE: Flemington Road (northern side) from Manning Clark Crescent (North) to Kate Crace Street.


    Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 23 May 2018
    7 am Thursday 17 May 2018 to 6 pm Friday 1 May 2020.GUNGAHLIN
    • FOOTPATH / VERGE: Swain Street (northern side) from Gribble Street to approximately 110 metres east towards Gozzard Street.


    Building construction works associated with the development of Block 2, Section 224 Gungahlin.

    Notification date: 10 May 2018
    5 pm Saturday 21 April 2018 to 5 pm Friday 31 August 2018.GUNGAHLIN
    • FOOTPATH: Hibberson Street (southern side) from Gungahlin Place (West) to Gungahlin Place (East).


    Works associated with the Gungahlin Bus Station project.

    Notification date: 17 Apr 2018
    7 am -11 am (daily) on periodic days as required Monday to Friday from Thursday 14 September 2017 to Friday 28 June 2019.GungahlinFOOTPATH: Hibberson Street (northern side) from Gozzard Street to Gribble Street.

    Construction works associated with the Raiders Club refurbishment project.

    Notification date: 14 Sep 2017
    6 am -11 am (daily) on periodic days as required Monday to Friday from Tuesday 19 September 2017 to Friday 28 June 2019.GungahlinFOOTPATH: Hibberson Street (northern side) from Gozzard Street to Gribble Street.

    Construction works associated with the Raiders Club refurbishment project.

    Notification date: 19 Sep 2017
    7 am Monday 28 August 2017 to 6 pm Friday 20 December 2019.GungahlinFOOTPATH / VERGE: Gribble Street (western side) between the Bright Beginnings Gungahlin driveway and Anthony Rolfe Avenue.

    Building construction works associated with the development of Block 5, Section 209 Gungahlin.

    Notification date: 25 Aug 2017
    6 am Monday 7 November 2016 to 6 pm Friday 29 June 2018.GungahlinFOOTPATH / NATURE STRIP: Hinder Street (western side) from Ernest Cavanagh Street to Anthony Rolfe Avenue.

    Building construction works associated with the development of Block 7, Section 38 Gungahlin.

    Notification date: 31 Oct 2016
    6 am Thursday 6 April 2017 to 7 pm Saturday 30 March 2019.GungahlinVERGE: Swain Street (northern side) from the driveway at 94 Swain Street to approximately 30 metres west towards Gribble Street.

    Sales display suite.

    Notification date: 31 Mar 2017
    7 am Wednesday 28 February 2018 to 5 pm Monday 30 April 2018.GungahlinFOOTPATH /VERGE: Manning Clark Crescent (western side) from the footpath connection located on the northern side of Barbara Jefferis Street to approximately 115 metres north of the Marie Pitt Street / Walling Street roundabout.

    Civil works associated with the Gungahlin Town Centre Works project

    Notification date: 21 Feb 2018
    9.30 am Monday 26 March 2018 to 4 pm Saturday 21 April 2018.GUNGAHLIN SIGNALISED PEDESTRIAN CROSSING: Manning Clark Crescent (North) (western side) at the intersection of Flemington Road.

    Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 19 Mar 2018
    7 am – 5 pm (daily) Monday to Saturday on periodic days as required from Monday 15 January 2018 to Saturday 2 March 2019.GungahlinFOOTPATH / VERGE: Gungahlin Place (eastern side from Sarre Street to Anthony Rolfe Avenue.

    Building construction works associated with the development of Block 1, Section 68 Gungahlin.

    Notification date: 14 Dec 2017
    7 am Tuesday 31 October 2017 to 5 pm Wednesday 31 October 2018.Gungahlin - NgunnawalSHARED USE PATH: Anthony Rolfe Avenue / Mirrabei Drive (western side) at the intersection of Gundaroo Drive.

    Works associated with the Gundaroo Drive duplication project.

    Notification date: 31 Oct 2017
    9.30 am Monday 9 April 2018 to 4 pm Friday 13 April 2018.HARRISON - FRANKLINSIGNALISED PEDESTRIAN CROSSING: Nullarbor Avenue (northern or southern side) at the intersection of Flemington Road.

    Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 26 Mar 2018
    4 pm Tuesday 5 June 2018 to 5 pm Friday 21 December 2018.KAMBAH
    • FOOTPATH: From Kett Street (between number 10 & 12 Kett Street) to approximately 85 metres west of Kett Street towards the Kambah Shops.
    • FOOTPATH: Located in the public open space within Blocks 52 & 53, Section 346 Kambah from number 28 Kett Street to approximately 90 metres west towards the Drakeford Drive underpass.


    Civil works associated with the ACT Healthy Waterways project – Package 4.

    Notification date: 05 Jun 2018
    7 am Wednesday 22 November 2017 to 5 pm Tuesday 20 November 2018.KambahFOOTPATH / VERGE: O’Halloran Circuit (western side) from the pedestrian refuge crossing located 25 metres north of Snodgrass Crescent to the temporary footpath connection to bus stop 100.

    Construction of new driveways and off site works associated with the development of Block 4, Section 239 Kambah.

    Notification date: 22 Nov 2017
    6 am Wednesday 31 May 2017 to 6 pm Friday 1 June 2018.KingstonFOOTPATH / NATURE STRIP: Parbery Street (eastern side) from Percy Douglas Lane to Dawes Street. Dawes Street (southern side) from Parbery Street to The Causeway.

    Building construction works associated with the redevelopment of Block 1, Section 60 Kingston.

    Notification date: 24 May 2017
    6 am Monday 20 November 2017 to 6 pm Monday 1 April 2019.KingstonFOOTPATH / VERGE: Parbery Street (eastern side) from Cunningham Street to the southern side of Charles Francis Lane. Dawes Street (southern side) from the western side of Parbery Street to The Causeway.

    Building construction works associated with the development of Block 1, Section 60 Kingston.

    Notification date: 21 Nov 2017
    6 am Wednesday 8 November 2017 to 7 pm Tuesday 23 October 2018.KingstonFOOTPATH/ NATURE STRIP: Kennedy Street (southern side) from the driveway of 14 Kennedy Street to Eyre Street. Eyre Street (western side) from Kennedy Street to approximately 60 metres south towards Leichhardt Street.

    Building construction works associated with the redevelopment of Block 1, Section 20 Kingston.

    Notification date: 07 Nov 2017
    6 am Monday 20 November 2017 to 6 pm Monday 1 April 2019.Kingston

    FOOTPATH / VERGE: Parbery Street (eastern side) from Cunningham Street to the southern side of Charles Francis Lane

    Dawes Street (southern side) from the western side of Parbery Street to The Causeway.



    Building construction works associated with the development of Block 1, Section 60 Kingston.

    Notification date: 22 Nov 2017
    7 am Friday 22 September 2017 to 6 pm Monday 17 September 2018.LawsonFOOTPATH / VERGE: Nevertire Street (western side) from outback Street to approximately 85 metres south of Outback Street.

    Building construction works associated with the development of Block 1, Section 22 Lawson.

    Notification date: 22 Sep 2017
    7 am Tuesday 1 May 2018 to 5 pm Saturday 30 June 2018.MONCRIEFF
    • FOOTPATH / VERGE: Bernard Heinze Avenue (northern side) from Yidaki Way to approximately 30 metres west towards Hoffmann Street.
    • FOOTPATH / VERGE: Yidaki Way (western side) from Bernard Heinze Avenue to approximately 30 metres north towards Silvabelles Street.


    EVO Energy electrical works.

    Notification date: 01 May 2018
    7 am Thursday 7 June 2018 to 5 pm Saturday 30 June 2018.MONCRIEFF
    • FOOTPATH / VERGE: Bon Scott Crescent (western side) from Coetmore Lane to O’Keefe Avenue.


    Installation of underground services associated with the development of Block 1, Section 26 Moncrieff.

    Notification date: 30 May 2018
    7 am Wednesday 6 June 2018 to 5 pm Saturday 30 June 2018.PAGE
    • NATURE STRIP: Knaggs Crescent (western side) from Dallachy Street to Birrell Street.
    • NATURE STRIP: Birrell Street (eastern side) from Knaggs Crescent to Burkitt Street.
    • FOOTPATH: Located in the public open space between Knaggs Crescent and Birrell Street.


    Footpath construction works associated with the Age Friendly Suburbs project.

    Notification date: 30 May 2018
    4 pm Thursday 24 May 2018 to 6 pm Wednesday 6 March 2019.PHILLIP
    • FOOTPATH / VERGE: Easty Street (western side) from Mower Place to the Hindmarsh Drive footpath connection at the end of Easty Street.


    Building construction works associated with the development of Block 19, Section 156 Phillip.

    Notification date: 25 May 2018
    6 am Saturday 30 June 2018 to 4 pm Friday 26 April 2019.PHILLIP
    • FOOTPATH / VERGE: Bradley Street (eastern side) from Corinna Street to the northern side of the multi storey car park.


    Westfield Woden building construction works.

    Notification date: 22 Jun 2018
    7 am 8 November 2017 to 6 pm Thursday 31 October 2019.PhillipFOOTPATH: Irving Street (western side) from Irving Street to approximately 80 metres north towards the Southern Cross health club car park.

    Building construction works associated with the redevelopment of Block 8, Section 24 Phillip.

    Notification date: 09 Nov 2017
    7 am Friday 26 May 2017 to 5 pm Sunday 1 July 2018.PhillipVERGE: Mower Place (southern side) from Tank Street to Easty Street.

    Building construction works associated with the development of Block 26, Section 158 Phillip.

    Notification date: 31 May 2017
    6 am Saturday 20 January 2018 to 6 pm Monday 1 June 2020.ReidFOOTPATH: Kogarah Lane (western side) from Boolee Street to Ainslie Avenue.

    Building construction works associated with the redevelopment of Block 2, Section 7 Reid.

    Notification date: 11 Jan 2018
    6 am Friday 1 June 2018 to 6 pm Saturday 30 May 2020.STROMLO (RURAL)
    • SHARED USE PATH: From the Dave McInnes Road off road connection to Uriarra Road.


    Building construction works associated with the new Stromlo Leisure Centre.

    Notification date: 30 May 2018
    7 am Friday 8 June 2018 to 6 pm Friday 29 March 2019.TAYLOR
    • FOOTPATH / VERGE: Bischoff Street (southern side) from Sutherland Crescent to approximately 45 metres west of Sutherland Crescent.
    • FOOTPATH / VERGE: Sutherland Crescent (western side) from the northern side of Bischoff Street to the southern side of Trevor Gibson Way.
    • FOOTPATH / VERGE: Trevor Gibson Way (northern side) from Sutherland Crescent to approximately 40 metres west of Sutherland Crescent.


    Building construction works associated with the development of Block 9, Section 39 Taylor.

    Notification date: 07 Jun 2018
    6 am Monday 12 March 2018 to 6 pm Tuesday 12 March 2019.TaylorFOOTPATH: Located on Block 11, Section 9 Taylor between Bischoff Street and Trevor Gibson Way

    Building construction works associated with the development of Block 9, Section 39 Taylor.

    Notification date: 06 Mar 2018
    6 am Wednesday 20 June 2018 to 8 pm Friday 1 February 2019.TAYLOR
    • FOOTPATH / VERGE: Feilman Street (northern side) from Shugg Street to Sutherland Crescent.


    Building construction works associated with the development of Block 3, Section 37 Taylor.

    Notification date: 13 Jun 2018
    7 am Monday 23 April 2018 to 5 pm Monday 30 July 2018.TAYLOR
    • FOOTPATH / VERGE: Shugg Street (eastern side) from Holford Street to Feilman Street.


    Installation of underground services associated with the development of Block 3, Section 37 Taylor.

    Notification date: 12 Apr 2018
    7 am Wednesday 2 May 2018 to 5 pm Friday 26 April 2019.TAYLOR
    • FOOTPATH / VERGE: Sutherland Crescent (western and northern side) from the southern side of Bischoff Street to approximately 450 metres northeast of Bischoff Street.


    Civil works associated with the development of Taylor Stage 3.

    Notification date: 01 May 2018
    7 am Tuesday 12 June 2018 to 5 pm Saturday 30 March 2019.THROSBY
    • FOOTPATH / VERGE: Bettong Avenue (southern side) from the eastern side of Kaigas Street to approximately 95 metres west towards Horse Park Drive.
    • FOOTPATH / VERGE: Kaigas Street (western side) from Bettong Avenue to Melomys Circuit.
    • FOOTPATH / VERGE: Melomys Circuit (northern side) from the eastern side of Kaigas Street to approximately 65 metres west towards Horse Park Drive.


    Building Construction works associated with the development of Block 1, Section 3

    Notification date: 07 Jun 2018
    9 am Monday 22 January 2018 to 4.30 pm Friday 29 June 2018.ThrosbyFOOTPATH: Bettong Avenue (eastern side) from Horse Park Drive to the footpath connection located approximately 40 metres south of Kunapalari Street.

    Throsby entrance feature construction works.

    Notification date: 15 Jan 2018
    6 am Tuesday 3 March 2018 to 8 pm Thursday 30 August 2018.TURNER
    • FOOTPATH: Condamine Street (southern side) from Northbourne Avenue to Forbes Street.


    Civil works associated with the Transport Canberra Light Rail project.

    Notification date: 29 Mar 2018

    9 am – 4.30 pm Monday to Friday;

    7 am – 5 pm Saturdays; and

    8 am – 5 pm Sundays

    Closures will in place be periodic days as required from Tuesday 19 June 2018 to Thursday 30 August 2018.

    YARRALUMLA

    Stage 1

    • FOOTPATH: Novar Street (western side) on either side of Bentham Street.

    Stage 2

    • FOOTPATH: Novar Street (eastern side) on either side of Bentham Street.


    ICON Water maintenance works.

    Notification date: 18 Jun 2018
    The ACT Government is committed to improving the accessibility of web content. To provide feedback or request an accessible version of a document please contact us or phone 13 22 81.

    We acknowledge the Traditional Custodians of the ACT, the Ngunnawal people. We acknowledge and respect their continuing culture and the contribution they make to the life of this city and this region.

    Bookmark and Share

    Feedback | Languages | Sitemap | Jobs ACT | Privacy | Disclaimer | Copyright Page last updated on 17 March 2016